You are here: Home » Government Press Release » News
Business Standard

Cabinet approves MoU between India and Nepal for laying down implementation arrangement for construction of a new Bridge over Mechi River at Indo-Nepal border

Delhi 

approves MoU between and for laying down implementation arrangement for construction of a new Bridge over Mechi River at Indo-border

The Union chaired by Prime Minister Shri Narendra Modi today approved a Memorandum of Understanding (MoU) to be signed between and for laying down implementation arrangement on Cost sharing, Schedules and Safeguard issues for starting construction of a new Bridge over Mechi River at Indo-border.

The estimated cost of construction of the bridge is Rs. 158.65 crore, which would be funded by Government of through ADB loan. The new bridge is part of up-gradation of the Kakarvitta (Nepal) to Panitanki Bypass (India) on NH 327B covering a length of 1500 meters including a 6 lane approach road of 825 meters. Mechi Bridge is the ending point of Asian Highway 02 in leading to and provides critical connectivity to

The construction of the bridge will improve regional connectivity and has potential to strengthen cross border trade between both the countries and cementing ties by strengthening industrial, social and cultural exchanges.

National Highway and Infrastructure Development Corporation (NHIDCL) under Ministry of Road Transport & Highways has been designated as the implementing agency for this project. DPR for this project has been prepared and alignment of bridge has been finalized in consultation with Government of

(This story has not been edited by Business Standard staff and is auto-generated from a syndicated feed.)

First Published: Wed, August 23 2017. 00:20 IST