You are here » Home » Companies » Company Overview » RTS Power Corporation Ltd

RTS Power Corporation Ltd.

BSE: 531215 Sector: Engineering
NSE: N.A. ISIN Code: INE005C01017
BSE LIVE 19:40 | 19 Oct 62.25 -0.10
(-0.16%)
OPEN

65.50

HIGH

65.50

LOW

62.00

NSE 05:30 | 01 Jan Stock Is Not Traded.
OPEN 65.50
PREVIOUS CLOSE 62.35
VOLUME 4851
52-Week high 68.35
52-Week low 24.25
P/E 16.25
Mkt Cap.(Rs cr) 51
Buy Price 0.00
Buy Qty 0.00
Sell Price 0.00
Sell Qty 0.00
OPEN 65.50
CLOSE 62.35
VOLUME 4851
52-Week high 68.35
52-Week low 24.25
P/E 16.25
Mkt Cap.(Rs cr) 51
Buy Price 0.00
Buy Qty 0.00
Sell Price 0.00
Sell Qty 0.00

RTS Power Corporation Ltd. (RTSPOWERCORPN) - Company History

Incorporated in Dec.'47 as Bhanwarlal Bhutoria Pvt Ltd, the Calcutta-based RTS Power Corporation became a public limited company in 1984. The company acquired its present name in Jan.'94. It came out with its maiden public issue in Aug.'85. The company was promoted by Sumermal Bhutoria. In 1971, the company set up production facilities to manufacture power and distribution transformers at Jaipur. Subsequently, the company set up manufacturing units at Agra, Jetpura and Bahadurgarh, Haryana. It started operations by manufacturing 16 kVA transformers. At present, it has a capacity to manufacture transformers upto 1600 kVA capacity. In 1995, the company diversified into the manufacture of high-rated power transformers. The company came out with a public issue in Aug.'95 to part-finance its diversification into power transformers and a simultaneous modernisation-cum-backward-integration programme. The latter involves processing major raw materials, while modernising the existing facilities by augmenting the wire-drawing and coating plant capacity, improving the functioning of the lamination plant by installing a slitting line and setting up a transformer oil-filteration unit. During the year 1995-96, The paid up equity capital is increased from Rs 0.98 cr to Rs 5.19 cr due the public cum Right issue made by the company. The company has undertaken steps to expand the transformers from 5000 KVA to 50000 KVA from its present range of transformers from 25 KVA to 3150 KVA. This project is expected to be commissioned by the end of Oct'96. The company has added another unit by installing new unit to manufacture and repair Power & Distribution Transformers at Salkia, West Bengal. During the year 1996-97, the company has installed another factory at Jaipur to manufacture Transformer upto 132 KV Class.