Business Standard

A COMMERCIAL FEATURE

What's this ?

Commercial Feature is a Business Standard Digital Marketing Initiative.

The Editorial/Content team at Business Standard has not contributed to writing or editing these articles.

For further information, please write to assist@bsmail.in

Suzlon bags contract from ReNew Power for 100.80 MW wind power project

The project, located at Ujjain in Madhya Pradesh, is scheduled for completion by March 2018

BS B2B Bureau  |  Pune 

ReNew Power's Limbwas project_Wind power
ReNew Power’s Limbwas wind power project

The solutions provider Group has won a fifth successive order from Ventures Pvt Ltd for its 100.80 MW project. will install 48 units of their latest S111 120m generators (WTG) with a capacity of 2.1 MW in ReNew Power’s Limbwas project located at Ujjain in Madhya Pradesh. 

will provide a comprehensive range of services including operation and maintenance services and dedicated life-cycle asset management services for an initial period of 10 years. This turnkey project for is scheduled to be completed by March 2018. The project has the potential to provide power to over 54,000 households and reduce 0.20 million tonnes of CO2 emissions per annum. 

“Being one of the leading players in the space in India, is committed towards ensuring that all our projects are executed using state-of-the art technology. with over two decades of experience in this sector has been our partner of choice and we are delighted to be working with them again,” said Sumant Sinha, founder chairman & CEO,

J P Chalasani, group CEO, Group, added, “This is the fifth repeat order from The S111 120m wind turbine’s cost effective design and superior performance offers reduced levelised cost of energy (LCoE). The new turbine has garnered an enthusiastic response from customer segments across the board.” 

With this order, Suzlon’s portfolio with would exceed more than 600 MW spanning across the states of Gujarat, Rajasthan, Maharashtra, Madhya Pradesh and Andhra Pradesh. 

The S11X 2.1 MW platform features the Doubly Fed Induction Generator (DFIG) technology which is designed to optimally harness available wind resources.

RECOMMENDED FOR YOU

Suzlon bags contract from ReNew Power for 100.80 MW wind power project

The project, located at Ujjain in Madhya Pradesh, is scheduled for completion by March 2018

The project, located at Ujjain in Madhya Pradesh, is scheduled for completion by March 2018
The solutions provider Group has won a fifth successive order from Ventures Pvt Ltd for its 100.80 MW project. will install 48 units of their latest S111 120m generators (WTG) with a capacity of 2.1 MW in ReNew Power’s Limbwas project located at Ujjain in Madhya Pradesh. 

will provide a comprehensive range of services including operation and maintenance services and dedicated life-cycle asset management services for an initial period of 10 years. This turnkey project for is scheduled to be completed by March 2018. The project has the potential to provide power to over 54,000 households and reduce 0.20 million tonnes of CO2 emissions per annum. 

“Being one of the leading players in the space in India, is committed towards ensuring that all our projects are executed using state-of-the art technology. with over two decades of experience in this sector has been our partner of choice and we are delighted to be working with them again,” said Sumant Sinha, founder chairman & CEO,

J P Chalasani, group CEO, Group, added, “This is the fifth repeat order from The S111 120m wind turbine’s cost effective design and superior performance offers reduced levelised cost of energy (LCoE). The new turbine has garnered an enthusiastic response from customer segments across the board.” 

With this order, Suzlon’s portfolio with would exceed more than 600 MW spanning across the states of Gujarat, Rajasthan, Maharashtra, Madhya Pradesh and Andhra Pradesh. 

The S11X 2.1 MW platform features the Doubly Fed Induction Generator (DFIG) technology which is designed to optimally harness available wind resources.

image
Business Standard
177 22

Suzlon bags contract from ReNew Power for 100.80 MW wind power project

The project, located at Ujjain in Madhya Pradesh, is scheduled for completion by March 2018

The solutions provider Group has won a fifth successive order from Ventures Pvt Ltd for its 100.80 MW project. will install 48 units of their latest S111 120m generators (WTG) with a capacity of 2.1 MW in ReNew Power’s Limbwas project located at Ujjain in Madhya Pradesh. 

will provide a comprehensive range of services including operation and maintenance services and dedicated life-cycle asset management services for an initial period of 10 years. This turnkey project for is scheduled to be completed by March 2018. The project has the potential to provide power to over 54,000 households and reduce 0.20 million tonnes of CO2 emissions per annum. 

“Being one of the leading players in the space in India, is committed towards ensuring that all our projects are executed using state-of-the art technology. with over two decades of experience in this sector has been our partner of choice and we are delighted to be working with them again,” said Sumant Sinha, founder chairman & CEO,

J P Chalasani, group CEO, Group, added, “This is the fifth repeat order from The S111 120m wind turbine’s cost effective design and superior performance offers reduced levelised cost of energy (LCoE). The new turbine has garnered an enthusiastic response from customer segments across the board.” 

With this order, Suzlon’s portfolio with would exceed more than 600 MW spanning across the states of Gujarat, Rajasthan, Maharashtra, Madhya Pradesh and Andhra Pradesh. 

The S11X 2.1 MW platform features the Doubly Fed Induction Generator (DFIG) technology which is designed to optimally harness available wind resources.

image
Business Standard
177 22