Business Standard
Friday, Feb 17, 2012
drived banner
drived banner
  Advanced Search
RSS
Content Guide
Follow us on  
||||Economy & Policy||||| 
 Section Home | News Now | Today's Paper | Features & Analysis | Politics & Public Affairs | Q&A | Columnists | BS Says
Home > Economy & Policy Live Markets | Commodities
 

Built for air force, Kaveri engine chosen by navy
Ajai Shukla / Bangalore Sep 08, 2009, 01:01 IST

The indigenous Kaveri aircraft engine, soon to make its debut flight, lacks the muscle needed by India’s Tejas light combat aircraft, which the engine was designed to power. In its present form, the Kaveri will never power a modern fighter.

But the engine’s technology — developed by the Defence R&D Organisation, over two decades, at a cost of Rs 3000 crore — will not be wasted. The Indian Navy is snapping up the Kaveri for powering its growing fleet of warships.

Business Standard has learnt that the navy has officially informed the Gas Turbine and Research Establishment (the DRDO laboratory that developed the Kaveri) that naval warships will needs 40 Kaveri Marine Gas Turbines (KMGTs) over the next 15 years.

In an important signal of its support, the navy has agreed to fund 25 per cent of the cost of the KMGT project.

GTRE has developed the marine Kaveri by modifying the aero engine with a shaft, through which power can be delivered to a propeller. The navy has extensively tested these engines at Visakhapatnam and found that the marine Kaveri can deliver 12 Megawatts (16,000 Horsepower) of propulsion power.

Typically warships run on regular diesel engines; gas turbines (such as the Kaveri) are added on to provide “boost power”, needed for manoeuvring in battle. Contemporary gas turbines, such as the General Electric LM2500, provide India’s latest 5000-tonne Shivalik class frigates with 22 Mw of boost. The Kaveri’s more modest 12 Mw is sufficient only for smaller warships.

While the marine Kaveri’s basic performance has been established (even the PM has seen a demonstration in Visakhapatnam), the GTRE Director, Dr Mohana Rao, is not yet satisfied with the basic design.

“So far, the KMGT is just a spin-off from the aero version”, Rao told Business Standard in Bangalore. “I want to give the navy an engine with far greater endurance. An aero engine’s life is just 3000 hours; a marine engine’s life should be 30,000 hours. I must physically test the KMGT for at least 15,000 hours.”

GTRE is going ahead with developing 3-4 test engines and beginning trials within three years. The trials will be conducted in a marine environment, which will include high humidity, and prolonged exposure to salt.

“We plan to begin delivery in about 6 years”, says the GTRE Director, “We hope to keep the cost below Rs 25-30 crores, which is considerably cheaper than buying imported gas turbines.”

Earlier this year, the US State Department had stopped General Electric from fitting its LM-2500 turbines on the INS Shivalik, apparently because GE had not obtained proper permissions from the US government.

Other than the 40 KMGTs, the Indian Navy has also issued a letter, on 6 th April 09, laying out a requirement for 42 Gas Turbine Generators, or GTGs. These are de-rated versions of the marine Kaveri, which will be used for generating electrical power on warships. Each GTG generates 1.2 Megawatts of power.

The Indian Navy, an enthusiastic proponent of indigenisation, proposes to replace the diesel generators fitted on older warships with the Kaveri GTG. If it performs well over a period of time, the new-generation warships will also get electrical power from the Kaveri GTG. Currently, only the Rajput and Delhi class of destroyers use gas turbines for power generation.

New Ipad Application :Business Standard's all new IPad App
Click here to download for free
Arrow Other Stories     
- Wall Street opens flat as data offsets Moody's warning
- Thomas Cook India Q4 net jumps three times
- Govt plans to make 30% sourcing from MSEs mandatory
- Explain ways to cover govt loss on 3G roaming: TDSAT to telcos
- Magma Fincorp plans to start gold finance biz in H1 of FY13
  Read Business news in 
- Now property search gets more exciting than ever before!
- High Growth Business Opportunities in Africa - Register to explore
- Medium-sized businesses are the engines of a smarter planet.
- We live for our family. have you secured them?
- Office 365 for professionals and small businesses.
- Earn fuel worth Rs.2400 with Citi
- India's No. 1 Property Site. Click here to know more..
- Diseases earlier, Saving Costs, Extending Lives. Know More..
- Get 5% cashback on telephone bills with Citi
- Enjoy the journey as much as the destination. click to know more..
- Exim Bank Conclave on India - Africa Project Partnership. Know more..
- Be part of it The World's Largest Aircraft.
- Creating Wealth made simple the SIP way. Know more..
- Only Developer to give a guarantee on time space & rate.
- Buy Your Property with Our Triple Guarantee in India.
- Improve Patient Care & Experience. Click here to know more
- Win a Business Class Ticket to Europe..Know more..
-  Introduce a New Automotive Luxury Car.. know more
- Health is Wealth..... Insurance + Savings... Know More...
Sorry, comments to this story are closed
Latest Messages
Posted by: dfasdf
6 years huh..I wonder how long it will take in reality..I am guessing 20 years.
Posted by: MAX
GTX-35VS Kaveri was being designed for 60.0 kN thrust and now this news says it can deliver 16,000 Horsepower i.e. 17.6 kN; not even half!!! What went wrong? I have seen few govt. labs and how people/scientists work there... govt. of India please push these people (scientists and engineers) to the limit, I'm sure Indian brain can do anything if used efficiently. Privatize all govt. Labs set goals, objectives and take hire and fire policy and then see how these same people perform for survival. I can say this because we are doing this as an employee of a private limited company.
Posted by: Victor
Excellent.
Posted by: dev
The spin offs for the civil sector are there too as marineised Kaveri engines in GTG avatars will be very suitable for greenfield projects,offshore oil installations,the NE states,island territories etc.A strong base for industrial applications can be built within the country.Marine gas turbines for export after successful naval service can be an important source of revenue especially in our littoral, ASEAN& Africa.
SmartInvestor+ E-zine
  Pay Rs.747/- for 3 years and
  get a branded watch FREE

  Subscribe Now
Most Popular
Read
E-Mailed
Commented
   
- Marico: Stepping into unchartered territory
- Asian stocks fall as Greek bailout delay dampens mood
- Sonalde Desai: Sons of the soil
- Bhupesh Bhandari: A spectrum of disagreement
- A crown of thorns awaits winners of BMC polls
 
 More  
New Ipad Application
 Business Standard's all new IPad  App
 Click here to download for free
  BS Specials  
    Full coverage of elections in Uttar Pradesh, Punjab, Uttarakhand, Manipur and Goa
  Hot Searches  
 
IRFC bond |  Antrix-Devas |  Rafale fighter |  Junglee |  IPL 5 |  Dhanlaxmi Bank |  Thomas Cook |  TCS |  Sarfaesi Act |  Vodafone |  Aakash tablet |  Sodexo |  Rupee |  Samsung Galaxy Note |  Kingfisher Airlines |  Silver |  Provident Fund |  income tax refund |  Anna Hazare |  iPhone |  Reliance Industries |  SEBI |  BSNL |  BSE |  NSE |  Mukesh Ambani |  Anil Ambani |  Infosys |  Pranab Mukherjee |  Sonia Gandhi |  Rahul Gandhi |  New Pension Scheme |  Reliance |  RBI |  GDP |  Gold |  Ratan Tata |  ICICI |  B-School |  Sensex |  Tax calculator |  Home Loan |  Personal Finance |  inflation |  oil prices |  Barack Obama |   
 
  Member Area Write to the Editor RSS Archives Advanced Search
  Subscribe to BS print product BS e-paper Newsletter Portfolio Tracker
  BS Products BS Hindi BS Motoring BS Books
FOR HOT PRODUCTS
BS Bazaar.com
Home | Markets & Investing | Companies & Industry | Banking & Finance | Economy & Policy | Opinion
Life & Leisure | Management & Marketing | Tech World
About Us | Partner With Us | Code of Conduct | Careers | Advertise with us| Terms & Conditions | Disclaimer | Contact Us