Business Standard
Sunday, May 27, 2012
Sponsored by  
drived banner
drived banner
  Advanced Search
RSS
Content Guide
Follow us on  
||||Economy & Policy||||| 
 Section Home | News Now | Today's Paper | Features & Analysis | Politics & Public Affairs | Q&A | Columnists | BS Says
Home > Economy & Policy Live Markets | Commodities
 

DRDO looks beyond HAL for Tejas production
Ajai Shukla / New Delhi Mar 24, 2011, 00:59 IST

Over the last two decades, Hindustan Aeronautics Ltd (HAL) and the DRDO’s Aeronautical Development Agency (ADA) have cooperated closely in developing the Tejas Light Combat Aircraft (LCA) to replace the ageing MiG-21s of the Indian Air Force. Now, with 40 fighters on order for the IAF’s first two Tejas squadrons, ADA is pushing HAL to outsource more of the Tejas’ production, including to the private sector, to boost production to the levels needed by the Indian Air Force (IAF).

A high-level HAL team is touring the production facilities of the world’s three biggest fighter manufacturers — Boeing and Lockheed Martin in the US; and Eurofighter in Europe — to examine how Tejas’ production can be raised from the eight fighters per year that HAL’s Tejas production line in Bangalore will start building next year. The IAF will eventually need 120-140 Tejas, while the Navy will require another 20-40 fighters.

The DRDO aeronautics chief, Prahlada, who also oversees ADA, told Business Standard, “We have asked HAL to find a way to step up Tejas production. They should look for alternatives, like more outsourcing, or setting up joint ventures [to build sub-systems of the Tejas]. This will also help HAL to grow. But each agency knows its own problems best… only they know where the shoe pinches! So, HAL knows best how to fix their problem.”

HAL, however, blames the slow production of Tejas fighters on the IAF’s placement of piecemeal orders. “We are also responsible to our shareholders. With an initial order for just 20 Tejas fighters, how much money could we have realistically invested in a production line?” asks P Soundara Rajan, HAL’s director, corporate planning and marketing. “So far, future Tejas orders of 100-120 more fighters are only plans. When an order is actually placed, we will be justified in upgrading our production line to produce more aircraft. Outsourcing to industry is something that we are already doing.”

Currently, HAL is building 40 Tejas fighters for the IAF, the initial IAF order of 20 fighters doubled recently with a second order. While HAL builds these 40 Tejas Mark I fighters, ADA will develop the Tejas Mark II, replacing the existing GE-404 engine with the more powerful GE-414 engine that powers the Swedish Gripen and the F-18 Super Hornet aircraft. ADA plans to develop the Tejas Mark II by 2014 and begin production the next year.

Behind the Tejas’ slow production rate is the fact that HAL simply has too much on its plate. The Aircraft R&D Centre (ARDC), the HAL department that has built the first 15 Tejas prototypes, is simultaneously developing the Tejas Mark II; the Sitara Intermediate Jet Trainer (IJT); the Indo-Russian Fifth Generation Fighter Aircraft (FGFA); the Indo-Russian Multi-Role Transport Aircraft (MRTA).

“Each Tejas is built individually, with the ARDC tweaking the design to incorporate multiple improvements and changes. Once the Tejas goes into serial production, like the MiG or Sukhoi-30 fighters, ARDC will have less work. But, presently, ARDC is highly loaded… and there is competition for attention and priority,” say HAL sources.

Despite that, there is no proposal for a second Tejas production line. The Ministry of Defence (MoD) has nominated HAL as the DRDO’s only production agency for aircraft. But the DRDO believes the growing number of projects will leave no choice but to locate a private sector partner for building aircraft, a field monopolised since independence by HAL.

“The earlier (the MoD finds an alternative) the better it will be because, in a country as big as India, with so many ongoing aircraft development programmes, we need at least two integration agencies. Preferably one government one private… this will lead to competition, better productivity, and the spreading of risk,” says Prahlada.

While ARDC builds the last two Tejas prototypes, HAL has already begun work on the first of the 40 Mark I production fighters. Meanwhile, ARDC is completing the first naval LCA, which is designed to operate off aircraft carriers. The navy is likely to ask for a limited series of eight LCAs, which will also be built by ARDC.

New Ipad Application :Business Standard's all new IPad App
Click here to download for free
Arrow Other Stories     
- Markets end flat
- Turbulence ahead for airlines despite oil price drop
- Weak rupee may bring cheer to NRIs, expats
- LIC buys PSU stocks, sells pvt sector blue-chips in Q4
- Banks may lower deposit rates as inflation eases: Report
  Read Business news in 
- Journey on, We are by Your Side. Click here to know more
- Benefits Upto Rs. 2.36 Lakhs on the Fully Loaded TJet Petrol.
- The Best Seller is Also the No. 1 in Mileage. Click here
- Watch The Film Here. Click here to know more..
- Leader in Passenger Car & Automobile Tyres. Click here
- 1 billion in saving for Unilever without any tangles.
- Learn How One City is Running on FOOD SCRAPS.
- One Partnership Endless Possibilities. Click here to know more
- Helping doctors detect diseases earlier, saving costs & extending lives.
- 36 Lakhs can get you a pool of Luxuries. Click here
- Which is the best plan for your daughter
- Check out the TRUE COLOURS of your Stocks, Now for FREE!
- One of the leading business schools in the world.Know More
Sorry, comments to this story are closed
Latest Messages
Posted by: lakshmand
with out production of 100 fighters per year tejus will not be a good sale option ,and re pase fighters in the depliting iaf...seperat production lines should made for fgaf too production of 250 fighters in a time span of 10 yers in not good it should be less than half ....
Posted by: chintan
HAL feels thats a the nations security is of less importance and that its shareholders needs is more important by this sentence "We are also responsible to our shareholders. With an initial order for just 20 Tejas fighters, how much money could we have realistically invested in a production line?" -- . What a pity for India and shame on Indian government?
Table for Two
  Now available at Special price
  Rs.280/- Only

  Buy Now
BS POLL
UPA 2 has completed three years. How do you rate its performance?  Read the story
  Good
  Average
  Bad
Submit
Most Popular
Read
E-Mailed
Commented
   
- India to guarantee safe gas transit from Tapi
- Air India pilots wanted a halt to command training of IA pilots
- Pak players likely to be part of IPL 2013
- EGoM to now decide on base price for spectrum auction
- New power equation in BJP
 
 More  
New Ipad Application
 Business Standard's all new IPad  App
 Click here to download for free
  Hot Searches  
 
Apalya |  Air India |  GAAR |  Agni  |  Solar eclipse |  Satyamev Jayate |  SRK |  Aamir Khan |  IPL |  Ertiga |  Sarfaesi Act |  Vodafone |  JP Morgan |  Transfer pricing |  Rupee |  Kingfisher Airlines |  Silver |  Provident Fund |  income tax refund |  iPhone |  Reliance Industries |  SEBI |  BSNL |  BSE |  NSE |  Mukesh Ambani |  Anil Ambani |  Infosys |  Pranab Mukherjee |  Sonia Gandhi |  Rahul Gandhi |  New Pension Scheme |  Reliance |  RBI |  GDP |  Gold |  Ratan Tata |  ICICI |  B-School |  Sensex |  Tax calculator |  Home Loan |  Personal Finance |  inflation |  oil prices |  Barack Obama |   
 
  Member Area Write to the Editor RSS Archives Advanced Search
  Subscribe to BS print product BS e-paper Newsletter Portfolio Tracker
  BS Products BS Hindi BS Motoring BS Books
Home | Markets & Investing | Companies & Industry | Banking & Finance | Economy & Policy | Opinion
Life & Leisure | Management & Marketing | Tech World | General News
About Us | Partner With Us | Code of Conduct | Careers | Advertise with us| Terms & Conditions | Disclaimer | Contact Us