Business Standard
Sunday, May 27, 2012
drived banner
drived banner
  Advanced Search
RSS
Content Guide
Follow us on  
||Companies & Industry||||||| 
 Section Home | News Now | Today's Paper | Q&A | People in the News | Industry News | Features | The Compass | Research & Analysis | Opinion | Corporate Results
Home > Companies & Industry Live Markets | Commodities
 

Failure to install beneficiation plant cost Rs 555.81cr: OMC
BS Reporter / Kolkata/ Bhubaneswar Jun 19, 2009, 00:06 IST

The failure of the state owned Orissa Mining Corporation (OMC) to install a new chrome ore beneficiation plant at Kaliapani to process 9.86 lakh tonne of low grade chrome ore has deprived the company and the government the opportunity to earn additional revenue of Rs 555.81 crore.

Export duty of Rs 90.55 was also lost in the process, according to the report of the Comptroller and Auditor General of India (CAG), tabled in the Orissa Legislative Assembly today, for the year ending 31 March 2008.

Exposing the inefficiency in OMC, the report said, though the company is in existence for more than 50 years, it could explore only 63 percent of the total mines given to it on lease by the state government. The company also failed to achieve the targeted production during this period despite the fixation of low targets.

Similarly, improper management of inventory by the company resulted in non-disposal and shortage of ores and increase in slow moving and non-moving store items. OMC couldn’t achieve the targeted production of ores during 2003-2008 except 2006-07.

The production of iron ore and chrome ore was below the target by 13.05 lakh tonne and 3.49 lakh tonne respectively from 2005-06 to 2007-08. The production target of contractors against total target fixed ranged between 84 and 93 percent for iron ore, 90 and 95 percent for chrome ore and 29 and 65 percent for manganese ore.

The achievements of the contractors between 2005-06 and 2007-08 in iron ore and chrome ore were also below target. It was 75 percent and 86 percent for iron ore and 91 percent and 85 percent for chrome ore during 2005-06 and 2007-08. However, despite shortfall in production by the contractors, OMC did not levy penalty on four contractors as per the terms and condition agreed with them, which resulted in the non-levy of Rs 94.29 lakh, the CAG report pointed out.

The report stated, the shortfall in production was due to fault of the management like delay in installation of weigh bridge, preparation of ground work, inadequate or delay in deployment of machineries and supply of explosives among others. Due to the failure of the company to provide required facilities resulted in a loss of contribution of Rs 350.1 crore to the revenue. Besides, failure in the replacement of the outdated Ore Handling Plant (OHP) at Daitari resulted in potential revenue loss of Rs 144.76 crore during this period.

Similarly, sale of lump ore instead of calibrated lump ore deprived OMC of earning additional revenue of Rs 3.72 crore. While award of the dumper maintenance contract without reference to available dumper hours caused avoidable expenditure of Rs 1.53 crore, engagement of loading contractor resulted in avoidable expenditure of Rs 2.53 crore. Stating that increasing production target without evolving appropriate strategy led to accumulation of ores resulting in blockage of Rs 71.53 crore, the report stated, failure to repay loan in time resulted in extra expenditure of Rs 22.44 crore.

New Ipad Application :Business Standard's all new IPad App
Click here to download for free
Arrow Other Stories     
- Markets end flat
- Turbulence ahead for airlines despite oil price drop
- Weak rupee may bring cheer to NRIs, expats
- LIC buys PSU stocks, sells pvt sector blue-chips in Q4
- Banks may lower deposit rates as inflation eases: Report
  Read Business news in 
- Journey on, We are by Your Side. Click here to know more
- 2 Lac Apartments, 1 Lac House / Plots. Click here
- Benefits Upto Rs. 2.36 Lakhs on the Fully Loaded TJet Petrol.
- The Best Seller is Also the No. 1 in Mileage. Click here
- Watch The Film Here. Click here to know more..
- Leader in Passenger Car & Automobile Tyres. Click here
- 1 billion in saving for Unilever without any tangles.
- A Brand New Server at a Price That Fits Your Budget. Click here
- Learn How One City is Running on FOOD SCRAPS.
- One Partnership Endless Possibilities. Click here to know more
- Helping doctors detect diseases earlier, saving costs & extending lives.
- 36 Lakhs can get you a pool of Luxuries. Click here
- Which is the best plan for your daughter
- Check out the TRUE COLOURS of your Stocks, Now for FREE!
- One of the leading business schools in the world.Know More
Sorry, comments to this story are closed
Latest Messages
Table for Two
  Now available at Special price
  Rs.280/- Only

  Buy Now
BS POLL
UPA 2 has completed three years. How do you rate its performance?  Read the story
  Good
  Average
  Bad
Submit
Most Popular
Read
E-Mailed
Commented
   
- India to guarantee safe gas transit from Tapi
- Air India pilots wanted a halt to command training of IA pilots
- Pak players likely to be part of IPL 2013
- EGoM to now decide on base price for spectrum auction
- New power equation in BJP
 
 More  
Tax Shastra
  Now available at Special price
  Rs. 360/- Only

  Buy Now
 
  Member Area Write to the Editor RSS Archives Advanced Search
  Subscribe to BS print product BS e-paper Newsletter Portfolio Tracker
  BS Products BS Hindi BS Motoring BS Books
Home | Markets & Investing | Companies & Industry | Banking & Finance | Economy & Policy | Opinion
Life & Leisure | Management & Marketing | Tech World | General News
About Us | Partner With Us | Code of Conduct | Careers | Advertise with us| Terms & Conditions | Disclaimer | Contact Us