Business Standard
Sunday, Nov 08, 2009
 
drived banner
drived banner
  Advanced Search
Feedback | RSS
Content Guide
Follow us on  
||||Economy & Policy||||| 
 Section Home | News Now | Today's Paper | Features & Analysis | Politics & Public Affairs | Q&A | Columnists | BS Says
Home > Economy & Policy Live Markets | Smart Portfolios II
  Search:

Pvt entry into nuclear power, coal mining
BS Reporter / New Delhi July 3, 2009, 0:49 IST

Survey says finance is only one of the problems holding back PPPs in infra.

 
 
Related Stories
News Now
-Japan to help nations in nuclear power generation
-India should manufacture equipment of N-industry: Kakodkar
-NPCIL to raise Rs 3,000 cr for early completion of plants
-India's nuclear plants improve power generation
-GE Hitachi to develop nuclear power plants with L&T
-Alstom or Siemens may join BHEL-NPCIL JV

The Economic Survey has made a pitch for greater private participation in the infrastructure sector,including the sensitive sectors of nuclear power generation and coal mining. It has called for allowing up to 49 per cent foreign direct investment in nuclear power and amending the Atomic Energy Act to allow private companies in the sector.

In coal, its prescription includes permitting private entry into mining under a well regulated and competitive regime, to reverse the substitution of domestic coal by imported oil and coal. It says : “As long as the coal sector remains a public sector monopoly (the only remaining nationalised sector), it could remain a bottleneck for accelerated development of the power sector.”
 

MIXED BAG
Public Private Partnership projects
 

Total number

Value of
contracts
(Rs crore)
Airports 6 20,041
Ports 38 43,053
Railways 3 1,007
Roads 187 47,755
Urban
development
35 6,218
Energy 31 17,802
Total 300 1,35,876

The survey emphasised that timely completion of infrastructure projects was critical to ensuring their financial viability and for reaping the economic benefits.

Pointing that a third of Rs 20,01,776-crore funding required for infrastructure development during the eleventh plan period is expected to be met from the private sector, the survey identifies six constraints in the public private partnership approach. These include policy and regulatory gaps, inadequate availability of finance for 10-year-plus tenure, inadequate capacity of officials to handle PPP projects, lack of manpower in the private sector, lack of enough bankable projects and lack of acceptance of PPP projects among stakeholders.

The survey said availability of finance was only a necessary condition for investment. “Once a project is financially closed, it is faced with issues like disputes in land acquisition, rehabilitation, contractual issues, shortage of raw materials, capital goods and fuel, environmental disputes and inadequate availability of skilled manpower,” said the survey. Another important point highlighted was the lack of generation of timely information, primarily due to multiplicity of implementing agencies.

As the economy slumped in activity, consequent to the commodity price and oil price shocks and then the global economic crisis, most infrastructure sectors witnessed subdued growth during 2008-09. Ports and air cargo slowed considerably, reflecting the sluggishness in import and export growth in the second half of 2008-09.

Rail freight growth slowed but to a lesser degree, due to demand from coal sector. It was only the telecom sector that recorded an exceptional growth, of about 45 per cent in tele-connectivity.

Within infrastructure, the survey said the increasing pressure of population on urban infrastructure makes it necessary to improve urban civic services. In the urban transport sector, the survey notes the ability to understand the problems is yet to mature and a scheme for capacity building at local, central and state level has been proposed.

  Read Business news in 
  Your dream home can now be a reality.
  Visit Fortis for a preventive health check-up & get a 20% discount.
  Follow the ups and downs of your investments. Try our new Portfolio Tracker
  Kolkata Dock \ Freight contract for the British Gurkhas Nepal
  Find how Midsize Businesses use ERP to gain competitive advantage
  Trading in Forex is now as easy as 1-2-3
  Discover an economical and cost effective way to market your products and services
  Giftwithlove.com: Same day delivery of Flowers and Cakes to India
  Download the E-book on the Future of Business Intelligence
  Learn Best Practices for improving customer satisfaction
  Know your customers better... download the free e-book on CRM
   Discussion Board / User Comments    
Display Name  Email-Id  
Post your comment
Most Popular
Read
E-Mailed
Commented
   
- Vendors to share BSNL's 3G ad spend
- Great Indian telecom boom begins to ring hollow
- Profit booking seen next week
- DTH sparks new row between producers and multiplexes
- Now, shell out Rs 80,000 more for a designer Nano
 
 More  
BS Poll
Cast Your Vote
 
   
 
Should the private sector be allowed to manage urban water supply?
  Yes  No
Submit

  Hot Searches  
 
Amitabh Bachchan | N Chandrasekaran | Swine Flu | Mukesh Ambani | Anil Ambani | TCS | Infosys |  Air India |  Duronto |  Pranab Mukherjee | Sonia Gandhi | Congress | Rahul Gandhi |  Bigg Boss |  New Pension Scheme |  Service tax |  Excise duty |  Sebi | Tech Mahindra |  Ramalinga Raju |  Satyam |  Reliance  |  RBI |  GDP |  Gold |  Ratan Tata |  ICICI |  |  B-School | DLF  Sensex |  Tax calculator | Home Loan  | Bollywood | Personal Finance |  inflation | oil prices |  World Bank | Reliance Infratel |  HDFC |  Barack Obama  
 
  Member Area Write to the Editor RSS Archives Advanced Search
  Subscribe to BS print product BS e-paper Newsletter Portfolio Tracker
  BS Products BS Hindi BS Motoring
FOR HOT PRODUCTS
BS Bazaar.com
Home | Markets & Investing | Companies & Industry | Banking & Finance | Economy & Policy | Opinion
Life & Leisure | Management & Marketing | Tech World
About Us | Partner With Us | Code of Conduct | Careers | Advertise with us| Terms & Conditions | Disclaimer | Site Map | Contact Us | Feedback