Business Standard
Tuesday, Nov 24, 2009
 
drived banner
drived banner
  Advanced Search
Feedback | RSS
Content Guide
Follow us on  
||Companies & Industry||||||| 
 Section Home | News Now | Today's Paper | Q&A | People in the News | Industry News | Features | The Compass | Research & Analysis | Opinion | Corporate Results
Home > Companies & Industry Live Markets | Smart Portfolios II
  Search:

Vallarpadam terminal hits roadblock
George Joseph / Chennai/ Kochi November 05, 2009, 0:12 IST

Work on road connectivity moves at a slow pace

 
 
Related Stories
News Now
-Connectivity problems dog Vallarpadam project
-Connectivity problems dog Vallarpadam project
-6 firms evince interest in bunkering terminal at Kochi port
-Container terminal set to sail
-Cochin port signs MoU for ro-ro facility
-Petronet to set up power plant in Kerala

Even as the construction work on the International Container Transshipment Terminal (ICTT) at Vallarpadam near here is going on at a brisk pace, concerns have been raised over the slow progress of the road connectivity project.

The terminal is expected to be operational by April 1, 2010.

The road connectivity between the terminal and NH 47 is crucial to the project as around 80 per cent of the container traffic will be by road in the initial stage, said Suresh Joseph, general manager of DP World, the developer of the terminal.

Even after repeated ultimatums from the Prime Minister’s Office, the work is still lagging owing to various reasons and it is unlikely that the road would be ready for the 4-lane traffic by March, 2010. Only 50 per cent of the road work has been so far completed.

A recent strike by tipper lorry workers had brought the work to a halt for 3 weeks and now shortage of river sand is only adding to the problem. Moreover, the slow progress in the linkage of bridges on the proposed road is a major hurdle as the two-lane traffic can be provided only when this is complete.

At some places, public outcry against the road is yet to be resolved.

The Cochin Port Trust has, however, assured DP World that the 2-lane traffic would be ready within the deadline. According to the contract between CPT and DP World, the former has to pay a huge compensation if the rail and road connectivity and allied infra facilities are not ready by March.

According to Joseph, in case the road connectivity is not ready, the CPT and the Ernakulam district administration have worked out two alternatives. The CPT will provide a roll on-roll off/lift on-lift off (ro ro/lo lo) barge service for transportation of containers between Willingdon and Vallarpadam islands for which it has signed an MoU with Inland Waterway Authority of India. It is also setting up modern inland waterway terminals at Willingdon and Bolghatty that will link all the 11 existing National Waterway-3 terminals from Kollam to Kottappuram with the new port logistic chain leading to ICTT.

Joseph said a substantial part of the container movement could be done through this, especially towards the southern part of Kerala.

The other alternative is allowing container movement through Vypeen-Parur road during night.

Work on the railway line between the terminal and Edappally too was impacted due to an agitation by dwellers of Makkaparambu area near Edappally. The dewellers are demanding a subway as the new railway line will literally cut them off from the rest of the world.

Meanwhile, the buildings would be completed by this December while yards by January next. The wharfs would become fully operational by March, he said.

Arrow Other Stories     
- Sensex ends up 130pts
- US universities welcomed for joint ventures: PM
- Sensex opens flat
- PM allays fears on eco reforms, invites US investments
- Nooyi for active role of US biz community in India's dev
More  
  Read Business news in 
  Get financial advisory and solutions for your projects
  Holidays starting at a delightful EMI of Rs 3481
  Switch on and say hello to Monday morning !
  Your dream home can now be a reality.
  Visit Fortis for a preventive health check-up & get a 20% discount.
  Follow the ups and downs of your investments. Try our new Portfolio Tracker
  Kolkata Dock \ Freight contract for the British Gurkhas Nepal
  Find how Midsize Businesses use ERP to gain competitive advantage
  Trading in Forex is now as easy as 1-2-3
  Discover an economical and cost effective way to market your products and services
  Giftwithlove.com: Same day delivery of Flowers and Cakes to India
  Download the E-book on the Future of Business Intelligence
  Learn Best Practices for improving customer satisfaction
  Know your customers better... download the free e-book on CRM
Share this Story  
 
 
   Discussion Board / User Comments    
Display Name  Email-Id  
Post your comment
Most Popular
Read
E-Mailed
Commented
   
- Infosys BPO chief quits; to join HDFC Standard Life
- Sebi showcause back to haunt RIL
- Search for Tejas engine nears its end
- Tea with BS: Amitabh Bachchan
- Mittal plans 6 mt plant in Karnataka
 
 More  
BS Poll
Cast Your Vote
 
   
 
Should educational institutions be allowed to approach the capital market?
  Yes  No
Submit

  Hot Searches  
 
Amitabh Bachchan | N Chandrasekaran | Swine Flu | Mukesh Ambani | Anil Ambani | TCS | Infosys |  Air India |  Duronto |  Pranab Mukherjee | Sonia Gandhi | Congress | Rahul Gandhi |  Bigg Boss |  New Pension Scheme |  Service tax |  Excise duty |  Sebi | Tech Mahindra |  Ramalinga Raju |  Satyam |  Reliance  |  RBI |  GDP |  Gold |  Ratan Tata |  ICICI |  |  B-School | DLF  Sensex |  Tax calculator | Home Loan  | Bollywood | Personal Finance |  inflation | oil prices |  World Bank | Reliance Infratel |  HDFC |  Barack Obama  
 
  Member Area Write to the Editor RSS Archives Advanced Search
  Subscribe to BS print product BS e-paper Newsletter Portfolio Tracker
  BS Products BS Hindi BS Motoring
FOR HOT PRODUCTS
BS Bazaar.com
Home | Markets & Investing | Companies & Industry | Banking & Finance | Economy & Policy | Opinion
Life & Leisure | Management & Marketing | Tech World
About Us | Partner With Us | Code of Conduct | Careers | Advertise with us| Terms & Conditions | Disclaimer | Site Map | Contact Us | Feedback