BS EDIT: Rising energy demand needs faster infrastructure upgrades

By Business StandardPublished On May 25, 2026

Early Heatwave

A developing super El Niño is pushing temperatures and electricity demand sharply higher

Demand Surge

India’s peak power demand has hit record levels as cooling needs rise across cities

Infrastructure Gaps

The Gurugram outage exposed weaknesses in maintenance and grid preparedness

Renewable Limits

Solar power helps during daytime peaks, but night-time demand still relies heavily on thermal power

Storage Challenge

Battery storage systems remain critical for scaling renewable energy reliably

Slow Progress

Despite incentives, battery manufacturing and energy-storage expansion have advanced slowly

Need for Preparation

India must upgrade grids, storage, and infrastructure quickly to meet rising power demand sustainably