The EPC project would involve the construction of pre-fabricated residential complexes in three locations--Dharan Al Janoube, Al Qahmah and Asir region (ABHA) and the work would be completed in about 36 months, the company said in a filing to the BSE.
The trading volumes on the counter have doubled, with 7.72 lakhs being traded on the BSE counter till 1.20PM as againt the two-week volume of 3.24 lakh shares.
IVRCL is a leading EPC and infrastructure company in India.