The new facility is spread across 14 acres with a built-up area of around 1,95,000 sq. feet. It has installed capacity of 10 to 20 tonnes (paddy/maize) of production per hour based on the crop, the company said in a release.
The new facility has been built at a cost of over Rs 21 crore, the release added.
The stock opened at Rs 395 and touched a high of Rs 408. At 10:35am, over 1 million shares were traded on both the stock exchanges.
