“The company will be executing this EPC order for captive co-generation power plant of 2x65MW capacity. The scope of the project includes design, engineering, manufacturing, construction and commissioning of the solid fuel based BTG package consisting of 2 CBFC boilers, steam turbines and generators”, Thermax said in press release.
The company will also provide emission control equipment and other auxiliaries for the BTG package. The project is to be completed in 24 months, it added.
At 09:46 AM; the stock was trading 4% higher at Rs 1,250, against a marginal 0.02% rise in the S&P BSE Sensex. A combined 44,134 shares changed hands on the counter on the BSE and NSE so far.
One subscription. Two world-class reads.
Already subscribed? Log in
Subscribe to read the full story →
Smart Quarterly
₹900
3 Months
₹300/Month
Smart Essential
₹2,700
1 Year
₹225/Month
Super Saver
₹3,900
2 Years
₹162/Month
Renews automatically, cancel anytime
Here’s what’s included in our digital subscription plans
Exclusive premium stories online
Over 30 premium stories daily, handpicked by our editors


Complimentary Access to The New York Times
News, Games, Cooking, Audio, Wirecutter & The Athletic
Business Standard Epaper
Digital replica of our daily newspaper — with options to read, save, and share


Curated Newsletters
Insights on markets, finance, politics, tech, and more delivered to your inbox
Market Analysis & Investment Insights
In-depth market analysis & insights with access to The Smart Investor


Archives
Repository of articles and publications dating back to 1997
Ad-free Reading
Uninterrupted reading experience with no advertisements


Seamless Access Across All Devices
Access Business Standard across devices — mobile, tablet, or PC, via web or app
)