Govt to set up 12,000 MW solar power projects with Rs 8,580-crore funding

The CCEA also approved a proposal for continuation of the scheme of 'Exploration of Coal and Lignite'

solar
Press Trust of India New Delhi
Last Updated : Feb 06 2019 | 10:45 PM IST

The government on Wednesday gave its nod to a proposal for setting up 12,000 MW grid-connected solar photovoltaic (PV) power projects with an estimated viability gap funding of Rs 8,580 crore.

The decision was taken by the Cabinet Committee on Economic Affairs (CCEA) chaired by Prime Minister Narendra Modi, Law Minister Ravi Shankar Prasad said here.

The proposal seeks to implement "the Central Public Sector Undertaking (CPSU) Scheme Phase-ll for setting up 12,000 MW grid-connected Solar PV Power Projects, by the Government Producers with Viability Gap Funding (VGF) support of Rs 8,580 crore for self-use or use by Government or Government entities, both Central and State Governments", an official statement said.

With the implementation of the scheme, 12,000 MW or more of grid-connected solar PV power projects would be set up by government producers in four years (2019-20 to 2022-23), thereby creating investment of about Rs 48,000 crore, it said.

"The Scheme will mandate use of both solar photovoltaic (SPV) cells and modules manufactured domestically as per specifications and testing requirements fixed by MNRE (Ministry of New & Renewable Energy)," it added.

The scheme aims to provide direct employment to about 60,000 persons for about one year in pre-commissioning activities/construction phase and to around 18,000 persons for about 25 years in the operation and maintenance period.

In addition, more than 1.2 lakh employment opportunities will be created for the local population by way of involvement in setting up of solar power projects and also in manufacturing of domestically produced cells and modules, the release said.

The CCEA also approved a proposal for continuation of the scheme of 'Exploration of Coal and Lignite' with an expected expenditure of Rs 1,875 crore.

"The approved scheme is for carrying out 24,41,500 meter of drilling and 3,575 line km (LKM) of surface geophysical survey for Promotional (Regional) Exploration & Detailed drilling in Non CIL Block in Coal and Lignite along with CBM/Shale gas studies and associated studies to estimate and prove coal resources during 3 years period," another release said.

Under the scheme, about 7 billion tonnes of resources will be established and 11 billion tonnes of resources will be proved.

*Subscribe to Business Standard digital and get complimentary access to The New York Times

Smart Quarterly

₹900

3 Months

₹300/Month

SAVE 25%

Smart Essential

₹2,700

1 Year

₹225/Month

SAVE 46%
*Complimentary New York Times access for the 2nd year will be given after 12 months

Super Saver

₹3,900

2 Years

₹162/Month

Subscribe

Renews automatically, cancel anytime

Here’s what’s included in our digital subscription plans

Exclusive premium stories online

  • Over 30 premium stories daily, handpicked by our editors

Complimentary Access to The New York Times

  • News, Games, Cooking, Audio, Wirecutter & The Athletic

Business Standard Epaper

  • Digital replica of our daily newspaper — with options to read, save, and share

Curated Newsletters

  • Insights on markets, finance, politics, tech, and more delivered to your inbox

Market Analysis & Investment Insights

  • In-depth market analysis & insights with access to The Smart Investor

Archives

  • Repository of articles and publications dating back to 1997

Ad-free Reading

  • Uninterrupted reading experience with no advertisements

Seamless Access Across All Devices

  • Access Business Standard across devices — mobile, tablet, or PC, via web or app

More From This Section

First Published: Feb 06 2019 | 10:05 PM IST

Next Story