?Reliance Industries and its partner BP plc of the UK have brought a deepsea pipeline laying ship to their Bay of Bengal block KG-D6 to help bring newer gas finds to production by 2020-21, the British firm said.
Reliance-BP are targeting to bring to production the R-Series and satellite fields in KG-D6 block by 2020, just around the time KG-D6 block's currently producing Dhirubhai-1 and 3 (D1 and D3) fields cease to produce.
These fields along with the ultra deep MJ find are to produce 30-35 million standard cubic metres per day of peak natural gas.
McDermott's DLV2000 vessel will install deepsea pipelines to connect the R-Series and satellite cluster discoveries to production system.
"2019 will see work pick up speed, three projects on track to bring gas on shore," BP India tweeted and attached a blog on DLV2000.
DLV2000 is a class 3 dynamic positioning vessel combining a 2,200-tonne revolving crane with a deepwater underdeck S-lay pipeline system configured to install pipelines with diameters ranging from 4.5 to 60 inches in water depths up to 10,000 feet.
"On 26th December, we completed the as planned mobilization of the ?DLV2000 on Reliance R / S Cluster 8 well OBO development project in Bay of Bengal, East Coast India for season 1 offshore campaign," BP said in the blog.
OBO refers to fields operated by others.
Reliance is the operator of KG-D6 block with 60 per cent interest while BP plc holds 30 per cent stake. Niko Resources of Canada holds the remaining 10 per cent.
The D1 and D3 fields, the first of the one-and-a-half dozen gas discoveries in KG-D6 that were brought to production in April 2009, will cease to produce by end-2019 or early 2020.
This shutdown will coincide with upgradation, modification, and preparation of facilities and operating system to connect new fields, sources said, adding the R-Series is likely to give first gas in mid-2020 while satellite and MJ field may begin output in 2021 and 2022.
Reliance has till date made 19 oil and gas discoveries in the Krishna Godavari basin. Of these, D26 or MA -- the only oil discovery in the block -- was the first field to begin production (in September 2008). D1 and D3 fields went onstream in April 2009. ?
Disclaimer: No Business Standard Journalist was involved in creation of this content
You’ve reached your limit of {{free_limit}} free articles this month.
Subscribe now for unlimited access.
Already subscribed? Log in
Subscribe to read the full story →
Smart Quarterly
₹900
3 Months
₹300/Month
Smart Essential
₹2,700
1 Year
₹225/Month
Super Saver
₹3,900
2 Years
₹162/Month
Renews automatically, cancel anytime
Here’s what’s included in our digital subscription plans
Exclusive premium stories online
Over 30 premium stories daily, handpicked by our editors


Complimentary Access to The New York Times
News, Games, Cooking, Audio, Wirecutter & The Athletic
Business Standard Epaper
Digital replica of our daily newspaper — with options to read, save, and share


Curated Newsletters
Insights on markets, finance, politics, tech, and more delivered to your inbox
Market Analysis & Investment Insights
In-depth market analysis & insights with access to The Smart Investor


Archives
Repository of articles and publications dating back to 1997
Ad-free Reading
Uninterrupted reading experience with no advertisements


Seamless Access Across All Devices
Access Business Standard across devices — mobile, tablet, or PC, via web or app
