Win some, lose some

Mumbai's monorail project will ease the pressure on commuters, but not everyone is looking forward to the project

Image
M Saraswathy Mumbai
Last Updated : Jan 21 2013 | 2:54 AM IST

The overhead monorail lines at the Wadala depot offer a glimpse into the future of the average daily commuter of Mumbai. These commuters who probably travel the maximum distance for a day’s work among all the other metros can expect their travel time to be reduced by half.

As one travels from Wadala depot to Bhakti Park, which would be the second major stop for the monorail, an array of shops selling everything, ranging from vada pav to detergent sachet, dot the roadside. “We definitely expect to have many more customers once the monorail starts plying,” says Abhijit Patil, a vada pav seller. Patil’s logic behind his thought is that shops near railway stations always make brisk business. “Take Andheri station. There are at least 50 shops nearby and all of them do good business,” he says.

Unlike Patil, there are a few others who are a little wary of the prospective competition that would crop up when the monorail operations begin at Wadala. A paan shop owner at the signal contemplates what would happen if several other people come and set up their business here? “It would be difficult for me to survive,” says Govind Tiwari, who earns his living by selling cigarettes and gutkha in the area.

Big real estate projects have also come up in the area, indicating proximity to the upcoming monorail as a major factor. Nearby residents, however, do not appreciate the ongoing construction and the heavy traffic that will be an inevitable part of the region once the station is fully functional. “It is a boon for people, no doubt about that, but for people like us who chose this particular area for residence only because it is relatively quiet and peaceful, this will be a nuisance,” says Rajiv Gupta, an octogenarian and an ex-government employee. Gupta, who is an asthma patient used to find it difficult to go for an evening walk due to the dust emanating from the monorail construction work. Now that the construction is almost over, his problems have been partly resolved. However, he says that the residents can’t complain too much as it is for the greater good of the city’s commuters.

Walking towards Mysore Colony, one gets a glimpse of autorickshaws that mark the landscape of suburban Mumbai. Owners of auto-rickshaws that — the most preferred mode of transport in this part of the town — may lose business have their own set of fears. “I just hope commuters will still use rickshaws to ply to and from the station,” says an auto-rickshaw driver.

The monorail project will connect Wadala to Chembur (8.26 km) in phase one and Jacob Circle to Wadala (11.28 km) in phase two. The tentative fare structure, according to Mumbai Metropolitan Region Development Authority ( reports, will range from Rs 8 to Rs 20. The 19.56-km corridor will cost around Rs 2460 crore (plus taxes) for both the two phases put together. The phase one of the project from Wadala to Chembur is expected to be completed by November 2012. The second phase of the project is expected to be completed by the second quarter of 2013. The civil work on the line on phase one is likely to end by August and the trial runs will begin thereafter.

Though it is still not clear when the project will be completely up and running, but impact of it has already been seen among the people. Whether it will make a positive difference by decongesting traffic and boosting the business of the likes of Tiwari and Patil or add chaos to the existing situation, that remains to be seen.

*Subscribe to Business Standard digital and get complimentary access to The New York Times

Smart Quarterly

₹900

3 Months

₹300/Month

SAVE 25%

Smart Essential

₹2,700

1 Year

₹225/Month

SAVE 46%
*Complimentary New York Times access for the 2nd year will be given after 12 months

Super Saver

₹3,900

2 Years

₹162/Month

Subscribe

Renews automatically, cancel anytime

Here’s what’s included in our digital subscription plans

Exclusive premium stories online

  • Over 30 premium stories daily, handpicked by our editors

Complimentary Access to The New York Times

  • News, Games, Cooking, Audio, Wirecutter & The Athletic

Business Standard Epaper

  • Digital replica of our daily newspaper — with options to read, save, and share

Curated Newsletters

  • Insights on markets, finance, politics, tech, and more delivered to your inbox

Market Analysis & Investment Insights

  • In-depth market analysis & insights with access to The Smart Investor

Archives

  • Repository of articles and publications dating back to 1997

Ad-free Reading

  • Uninterrupted reading experience with no advertisements

Seamless Access Across All Devices

  • Access Business Standard across devices — mobile, tablet, or PC, via web or app

More From This Section

First Published: Apr 15 2012 | 12:18 AM IST

Next Story