CM stresses use of modern technology in building bridges, FoBs

Image
Press Trust of India Mumbai
Last Updated : Jun 12 2019 | 10:45 PM IST

Maharashtra Chief Minister Devendra Fandavis Wednesday called for use ofstate-of-the-art technology while building bridges, railway bridges and foot- over bridges in Mumbai to ensure longevity of the structures.

He also suggested developing a mobile application to inform people about the bridges where traffic is shut and also about the alternative routes.

Fadnavis gave these suggestions while addressing a review meeting about vulnerable bridges in Mumbai. BJP MP Gopal Shetty, MLAs Ashish Shelar, Raj Purohit, Amit Satam, Brihanmumbai Municipal Corporation (BMC) Commissioner Pravin Pardeshi and others were present on the occasion.

Stating that various authorities were involved in the construction of FoBs in Mumbai, Fadnavis said these structures should not be built just to last for30 to 35years.

Instead, construction should be carried out by using latest technologies, so that it lasts for a longer period.

Fadnavis directed officials to display boards showing alternative routes to people where roads have been closed due to repair works of bridge.

Hetold the officials to put up boards to inform people as to by which date the repair work would be completed. The CM also directed the officials to develop a mobile application for the same.

He said that at times traffic jams are witnessed at market places and parking facility needs to be provided near these spota.

He directed the officials to create alternative traffic routes near the market places so that traffic jams are averted.

He said that concessions in BEST bus fares also could be considered if required.

There are344bridges in Mumbai, of which314are within the BMC jurisdiction. There are30bridges which are under the Mumbai Metropolitan Regional Development Authority (MMRDA) and29 of these30bridges have been shut down after the structural audit.

Ninety twobridges are in good condition, while116 are undergoing minor repairs. Sixty seven bridges are undergoing major repair works.

The Central Railway (CR) has undertaken inspection of 199 bridges, while the Western Railway (WR) has newly constructed32foot over bridges.

IIT and VJTI have re-inspected the two bridges at Ghatkopar and Juhu Tara Road, after which these bridges would be repaired by using modern technology.

It was decided during the meeting that these bridges would be opened for traffic after the repair work gets over, a statement from the chief minister's office (CMO) said.

Disclaimer: No Business Standard Journalist was involved in creation of this content

*Subscribe to Business Standard digital and get complimentary access to The New York Times

Smart Quarterly

₹900

3 Months

₹300/Month

SAVE 25%

Smart Essential

₹2,700

1 Year

₹225/Month

SAVE 46%
*Complimentary New York Times access for the 2nd year will be given after 12 months

Super Saver

₹3,900

2 Years

₹162/Month

Subscribe

Renews automatically, cancel anytime

Here’s what’s included in our digital subscription plans

Exclusive premium stories online

  • Over 30 premium stories daily, handpicked by our editors

Complimentary Access to The New York Times

  • News, Games, Cooking, Audio, Wirecutter & The Athletic

Business Standard Epaper

  • Digital replica of our daily newspaper — with options to read, save, and share

Curated Newsletters

  • Insights on markets, finance, politics, tech, and more delivered to your inbox

Market Analysis & Investment Insights

  • In-depth market analysis & insights with access to The Smart Investor

Archives

  • Repository of articles and publications dating back to 1997

Ad-free Reading

  • Uninterrupted reading experience with no advertisements

Seamless Access Across All Devices

  • Access Business Standard across devices — mobile, tablet, or PC, via web or app

More From This Section

First Published: Jun 12 2019 | 10:45 PM IST

Next Story