Delhi Metro completes record 21-metre high cross-over viaduct

Image
Press Trust of India New Delhi
Last Updated : Apr 20 2014 | 7:30 PM IST
The Delhi Metro Rail Corporation (DMRC) has achieved a rare feat in Metro construction by crossing over its existing operational line at the Kakarduma Metro Station at a record height of 21 meters above the ground.
"This is among the first of such achievements in Metro construction so far as Delhi Metro is poised to repeat more such achievements in its Phase III project which is slated to be completed by 2016," a DMRC official said.
The elevated viaducts of Phase III project will pass over the existing viaducts of the Phase I and Phase II metro corridors at four more different locations.
At Netaji Subhas Place, the viaduct of the Majlis Park - Shiv Vihar corridor will pass over Line 1 of Rithala - Dilshad Garden.
The viaduct of the Majlis Park - Shiv Vihar corridor will pass over Airport Express Line at Dhaula Kuan.
The Majlis Park - Shiv Vihar corridor viaduct will pass over Line III of Dwarka Sector 21 to NOIDA City Centre at Mayur Vihar.
At Anand Vihar, viaduct of the Majlis Park - Shiv Vihar corridor will pass over Line IV of Yamuna Bank - Vaishali.
"Construction for crossing over of Metro viaduct at the existing Karkarduma Metro station was never an easy task for the Metro engineers. It posed numerous challenges to the civil engineers throughout the project as this is one of the highest crossings of Metro line," the official said.
The new 59-kilometers long Majlis Park - Shiv Vihar metro line is crossing the existing Vaishali- Dwarka elevated line at 21 m above the ground and is 10 m above the existing Metro line.
"Delhi Metro has crossed the existing Metro line at such a height in a very safe and systematic manner with all safety precautions in place. The launching of girder and erection of span was carried out in a very watchful manner with extra precaution," the official assured.
According to DMRC official, an extensive round-the-clock CCTV monitoring was done adjacent to the rail track to avoid any signs of electrocution and fall of material during crossing.
*Subscribe to Business Standard digital and get complimentary access to The New York Times

Smart Quarterly

₹900

3 Months

₹300/Month

SAVE 25%

Smart Essential

₹2,700

1 Year

₹225/Month

SAVE 46%
*Complimentary New York Times access for the 2nd year will be given after 12 months

Super Saver

₹3,900

2 Years

₹162/Month

Subscribe

Renews automatically, cancel anytime

Here’s what’s included in our digital subscription plans

Exclusive premium stories online

  • Over 30 premium stories daily, handpicked by our editors

Complimentary Access to The New York Times

  • News, Games, Cooking, Audio, Wirecutter & The Athletic

Business Standard Epaper

  • Digital replica of our daily newspaper — with options to read, save, and share

Curated Newsletters

  • Insights on markets, finance, politics, tech, and more delivered to your inbox

Market Analysis & Investment Insights

  • In-depth market analysis & insights with access to The Smart Investor

Archives

  • Repository of articles and publications dating back to 1997

Ad-free Reading

  • Uninterrupted reading experience with no advertisements

Seamless Access Across All Devices

  • Access Business Standard across devices — mobile, tablet, or PC, via web or app

More From This Section

First Published: Apr 20 2014 | 7:30 PM IST

Next Story