Metro work won't completely affect cricket at Oval,Azad Maidan

Image
Press Trust of India Mumbai
Last Updated : Oct 05 2015 | 8:57 PM IST
The Mumbai Metro Rail Corporation (MMRC) today clarified that cricket at both Oval and Azad Maidan in South Mumbai will not be completely affected during construction of the proposed underground Colaba-Seepz Metro corridor.
The metro plan was criticised by locals who alleged that cricket will be completely disturbed and both the grounds will be usurped by the impending construction of the corridor.
"Cricket pitches or matches at the Oval maidan will not be disturbed during the construction of the Metro-3 corridor," Mumbai Metro Rail Corporation (MMRC) Managing Director Ashwini Bhide said in a statement.
MMRC is the implementing agency for the Metro projects under the Mumbai Metropolitan Region Development Authority (MMRDA).
However, Bhide said a few cricket pitches at Azad Maidan will be required to be relocated and the MMRC is working closely with the sports department to ensure that majority of the cricketing activity continues at Azad Maidan.
"The entire Oval Maidan is spread over 90,000 sq mt of and the metro corridor will temporarily require 3,900 sq mt, which is nearly four per cent of the entire ground, towards its north only during the project implementation period of 3-4 years and will be restored and returned post construction," she said.
Since the plot required is very small and is towards the northern side of the ground, there is no likelihood of causing any disturbance to the cricketing activity at the Oval, Bhide added.
As far as the 2 lakh sqmt Azad Maidan is concerned, the corridor temporarily requires 32,687 sq mt, 16 per cent of the entire ground, behind the Mumbai Press Club which will also be restored.
"The corridor will require only 1,000 sqmt of Azad Maidan permanently," she added.
The entire 33.5 km long Colaba-Bandra-Seepz corridor will require only 39.09 hectares of which 27.29 hectares is required temporarily and 11.80 hectares permanently.
The metro will carry 14 lakh commuters daily and will connect Nariman Point, Cuffe Parade (WTC), Fort, Worli, Lower Parel, BKC, Seepz.
*Subscribe to Business Standard digital and get complimentary access to The New York Times

Smart Quarterly

₹900

3 Months

₹300/Month

SAVE 25%

Smart Essential

₹2,700

1 Year

₹225/Month

SAVE 46%
*Complimentary New York Times access for the 2nd year will be given after 12 months

Super Saver

₹3,900

2 Years

₹162/Month

Subscribe

Renews automatically, cancel anytime

Here’s what’s included in our digital subscription plans

Exclusive premium stories online

  • Over 30 premium stories daily, handpicked by our editors

Complimentary Access to The New York Times

  • News, Games, Cooking, Audio, Wirecutter & The Athletic

Business Standard Epaper

  • Digital replica of our daily newspaper — with options to read, save, and share

Curated Newsletters

  • Insights on markets, finance, politics, tech, and more delivered to your inbox

Market Analysis & Investment Insights

  • In-depth market analysis & insights with access to The Smart Investor

Archives

  • Repository of articles and publications dating back to 1997

Ad-free Reading

  • Uninterrupted reading experience with no advertisements

Seamless Access Across All Devices

  • Access Business Standard across devices — mobile, tablet, or PC, via web or app

More From This Section

First Published: Oct 05 2015 | 8:57 PM IST

Next Story