"Permission is granted to all the units to carry out operations at optimum level, as a trial run from June 7 to June 25. During this period, the joint inspection team will visit and collect samples of effluents discharged from these units," a bench headed by judicial member U D Salvi said.
The tribunal, while passing an order on a bunch of pleas, asked all the industrial units to furnish details of steps taken by them to curb pollution level to the joint inspection team, comprising experts from Uttar Pradesh Pollution Control Board (UPPCB), Central Pollution Control Board (CPCB) and IIT-Kanpur by June 6.
The green tribunal added that after the effluent samples are analysed by the joint inspection team, the reports should be placed before it and posted the matter for further hearing on July 25.
It, however, made it clear that the units which are closed and allowed to operate for the trial run period shall shut down after the period, while those units which are operational will continue running.
The NGT, which had earlier termed the 700 tanneries in Kanpur situated on the river bank as one of the "highest sources of pollution," had also warned them of coercive action if they failed to comply with environmental laws.
