Power Transmission and Distribution:
On the domestic front, the business has secured orders for urban electricity distribution from a state distribution utility. The project scope includes replacing the existing HT & LT overhead lines with underground cables. In addition, new 11kV feeders will also be created for load bifurcation. Such projects improve the overall reliability of the power distribution network and help particularly in avoiding the unscheduled power cuts during rains and windy conditions.
Another order for turnkey construction of a 400kV and 220kV Transmission Lines has been secured from a state transmission utility.
In the international market, an order has been secured for the supply, installation and commissioning of 132kV underground cables in United Arab Emirates (UAE).
In Ethiopia and Uganda, orders have been received for establishing distribution networks involving medium/ low voltage distribution lines and last mile consumer connections. These will improve electricity access in their respective towns and rural areas.
The business has also won an order, in a consortium, for the supply and construction of Battery Energy Storage Systems for 115kV substations in Chaiyaphum and Lopburi provinces of Thailand. These state-of-art elements will mitigate the impact from grid connection of intermittent renewable generation.
Heavy Civil Infrastructure:
The Defence business unit of Heavy Civil Infrastructure has secured order from one of the major Defence PSUs for the construction of a strategic project for the Indian Air Force.
The scope includes construction of under-ground specialized RCC structure along with water proofing, electrical works and other Internal Et external services. The project is to be completed within a timeline of 33 months.
Water and Effluent Treatment:
Engineering, procurement & construction orders have been secured from the Gujarat Water Infrastructure for supplying, lowering, laying, jointing, testing and commissioning of a MS pipeline from Brahmani Dam - 2 to Chakampar village (Package II) and from Chakampar village to Nava Sadulka (Package III) including its operation & maintenance for 5 years in Morbi district, Gujarat. The business has bagged repetitive orders from the same client over the past few years.
Powered by Capital Market - Live News
Disclaimer: No Business Standard Journalist was involved in creation of this content
You’ve reached your limit of {{free_limit}} free articles this month.
Subscribe now for unlimited access.
Already subscribed? Log in
Subscribe to read the full story →
Smart Quarterly
₹900
3 Months
₹300/Month
Smart Essential
₹2,700
1 Year
₹225/Month
Super Saver
₹3,900
2 Years
₹162/Month
Renews automatically, cancel anytime
Here’s what’s included in our digital subscription plans
Exclusive premium stories online
Over 30 premium stories daily, handpicked by our editors


Complimentary Access to The New York Times
News, Games, Cooking, Audio, Wirecutter & The Athletic
Business Standard Epaper
Digital replica of our daily newspaper — with options to read, save, and share


Curated Newsletters
Insights on markets, finance, politics, tech, and more delivered to your inbox
Market Analysis & Investment Insights
In-depth market analysis & insights with access to The Smart Investor


Archives
Repository of articles and publications dating back to 1997
Ad-free Reading
Uninterrupted reading experience with no advertisements


Seamless Access Across All Devices
Access Business Standard across devices — mobile, tablet, or PC, via web or app
