The project would be implemented on EPC mode with construction period of 24 months. The project includes upgradation of the highway from 2 lane to 4 lane with rigid pavement (cement concrete road), along with construction of 4 major bridges, 20 minor bridges, 9 underpasses at the location of minor junction and 29 minor junctions for the free and safe movement of road users.
Thirteen kilometer of the project road passes through wild life sanctuary in which 39.750 ha. area of wildlife forest land is required for diversion. The road also passes through Reserve and Protected forest for 2 km length in which 11.081 ha. forest land is required for diversion. In order to facilitate free and safe movement of wildlife, adequate mitigation measures have been included in the project viz. additional span of 5m on the either side of the major bridges, provision of structures of size 5X3.5M at 25 locations.
On completion of the project, the journey on this highway stretch will become safer, saving time, fuel and vehicle maintenance cost.
Powered by Capital Market - Live News
Disclaimer: No Business Standard Journalist was involved in creation of this content
You’ve reached your limit of {{free_limit}} free articles this month.
Subscribe now for unlimited access.
Already subscribed? Log in
Subscribe to read the full story →
Smart Quarterly
₹900
3 Months
₹300/Month
Smart Essential
₹2,700
1 Year
₹225/Month
Super Saver
₹3,900
2 Years
₹162/Month
Renews automatically, cancel anytime
Here’s what’s included in our digital subscription plans
Exclusive premium stories online
Over 30 premium stories daily, handpicked by our editors


Complimentary Access to The New York Times
News, Games, Cooking, Audio, Wirecutter & The Athletic
Business Standard Epaper
Digital replica of our daily newspaper — with options to read, save, and share


Curated Newsletters
Insights on markets, finance, politics, tech, and more delivered to your inbox
Market Analysis & Investment Insights
In-depth market analysis & insights with access to The Smart Investor


Archives
Repository of articles and publications dating back to 1997
Ad-free Reading
Uninterrupted reading experience with no advertisements


Seamless Access Across All Devices
Access Business Standard across devices — mobile, tablet, or PC, via web or app
