The second 1,000 MW unit at the Kudankulam Nuclear Power Project (KNPP) was shut down on Thursday for maintenance work, according to the Power System Operation Corporation Limited.
The unit's restart date was however, not mentioned.
The first unit that was shut down on August 1 for annual maintenance is expected to restart on November 5.
Similarly the first 220 MW unit at the Madras Atomic Power Station (MAPS) which was shut down on January 30 for annual maintenance is expected to restart power generation on November 18.
The KNPP which is in Tirunelvelli about 650 km from here and the MAPS in Kalpakkam near here are owned by atomic power plant operator Nuclear Power Corporation of India Ltd (NPCIL).
The NPCIL has two 1,000 MW nuclear power plants at KNPP built with Russian equipment.
You’ve reached your limit of {{free_limit}} free articles this month.
Subscribe now for unlimited access.
Already subscribed? Log in
Subscribe to read the full story →
Smart Quarterly
₹900
3 Months
₹300/Month
Smart Essential
₹2,700
1 Year
₹225/Month
Super Saver
₹3,900
2 Years
₹162/Month
Renews automatically, cancel anytime
Here’s what’s included in our digital subscription plans
Exclusive premium stories online
Over 30 premium stories daily, handpicked by our editors


Complimentary Access to The New York Times
News, Games, Cooking, Audio, Wirecutter & The Athletic
Business Standard Epaper
Digital replica of our daily newspaper — with options to read, save, and share


Curated Newsletters
Insights on markets, finance, politics, tech, and more delivered to your inbox
Market Analysis & Investment Insights
In-depth market analysis & insights with access to The Smart Investor


Archives
Repository of articles and publications dating back to 1997
Ad-free Reading
Uninterrupted reading experience with no advertisements


Seamless Access Across All Devices
Access Business Standard across devices — mobile, tablet, or PC, via web or app
)