Akademik Lomonosov, the world's first "floating" nuclear power plant (FNPP) for installation in remote areas, has headed out on its first sea voyage from this Baltic shipyard here, Russian state-run atomic energy corporation Rosatom said on Saturday.
A statement said the FNPP was towed out of the St. Petersburg shipyard where it was constructed for travel to its final destination to the port of Pevek in Russia's extreme northeastern region of Chukotka.
It is to be towed through the Baltic Sea and around the northern tip of Norway to Murmansk, where its reactors will be loaded with nuclear fuel, said Rosatom, who are the equipment suppliers and consultants for the Kudankulam Nuclear Power Project in Tamil Nadu.
"Akademik Lomonosov will replace Pevek's aging Bilibino Nuclear Power Plant and Chaunsk coal-fired power plant, saving about 50,000 tons of CO2 emissions per year compared to the current levels. Upon its connection to the grid, Akademik Lomonosov will become the northernmost nuclear installation in the world," it said.
The Lomonosov is expected to be put into service in early 2019.
"It is a significant milestone for our project as well as for the world nuclear industry. Floating nuclear power plants will enable electricity and heat supply to the most remote regions boosting growth and sustainable development," Rosatom Director (Construction and Operation of Floating Nuclear Thermal Power Plants) Vitaly Trutnev said in a statement.
An FNPP is basically a mobile, low-capacity reactor unit operable in remote areas isolated from the main power distribution system, or in places hard to access by land. They are designed to maintain both uninterruptible power and plentiful desalinated water supply in remote areas.
The FNPP has a capacity of 70MW and is equipped with two reactors of 35MW each.
Rosatom said that an FNPP's operational life span is 40 years, with the possibility of being extended up to 50 years.
--IANS
bc/nir/vm
Disclaimer: No Business Standard Journalist was involved in creation of this content
You’ve reached your limit of {{free_limit}} free articles this month.
Subscribe now for unlimited access.
Already subscribed? Log in
Subscribe to read the full story →
Smart Quarterly
₹900
3 Months
₹300/Month
Smart Essential
₹2,700
1 Year
₹225/Month
Super Saver
₹3,900
2 Years
₹162/Month
Renews automatically, cancel anytime
Here’s what’s included in our digital subscription plans
Exclusive premium stories online
Over 30 premium stories daily, handpicked by our editors


Complimentary Access to The New York Times
News, Games, Cooking, Audio, Wirecutter & The Athletic
Business Standard Epaper
Digital replica of our daily newspaper — with options to read, save, and share


Curated Newsletters
Insights on markets, finance, politics, tech, and more delivered to your inbox
Market Analysis & Investment Insights
In-depth market analysis & insights with access to The Smart Investor


Archives
Repository of articles and publications dating back to 1997
Ad-free Reading
Uninterrupted reading experience with no advertisements


Seamless Access Across All Devices
Access Business Standard across devices — mobile, tablet, or PC, via web or app
