The Kerala Rail Development Corporation Ltd on Thursday said a final decision on the alignment of the proposed 532 km double line Kasaragod-Thiruvananthapuram Semi-High Speed Rail (SHSR) rail corridor had not yet been taken.
The corporation also dismissed as baseless and misleading reports in a section of the media that a final decision on the alignment of the rail corridor has been taken.
It is absolutely misleading and baseless to suggest that KRDCL has taken a final decision on the proposed SHSR rail corridor, a top official of the corporation clarified.
The work currently in progress is that of marking the ground-points for conduct of aerial survey.The ground-points are being marked at a distance of every 25 km and with as much width, the official pointed out.
This work has been misunderstood by some as that of marking the alignment of the ambitious rail project. The alignment will be finalised only with the approval of the state government and after completion of the aerial survey and further studies, a press release, quoting the official, said.
The process of land acquisition for the greenfield project will start only after the finalisation of the alignment, that too with the government approval, it said.
A joint venture of the Kerala government and Ministry of Railways, the state cabinet gave its go-ahead to the SHSR after thoroughly considering the feasibility study that has fully taken into account every minute aspect of the project, including the passenger potential and financial viability.
This study, which has found that social, economic and environmental benefits to be derived from the project are substantial, is under the Railway ministry's consideration.
Further studies and surveys are in progressing as part of the process of drawing up the Detailed Project Report (DPR), according to the release.
Seen as a game-changer in Keralas infrastructure and economic development, SHSR is to be implemented with minimum land acquisition.
A salient feature of the project is its total adherence to the green protocol, down to the last-minute detail.
Besides drastically cutting short the travel time, SHSR will considerably reduce atmospheric pollution caused by road traffic and also bring down road mishaps.
Trains on the track, which cuts through 11 districts, will run at a speed of 200 km per hour, covering the distance between the state capital, Thiruvanathapuram and Kasaragod by four hours.
Besides being a boon to all categories of passengers, the corridor will serve as a major line of freight transport, which is now mostly hauled by heavy, traffic-clogging and air-polluting trucks along the highways across the state.
The project also has many added environmental features such as the use of clean energy by tapping solar power in a big way, reuse of concrete and steel, use of low-emission construction equipment and promoting urban forestry programme.
Disclaimer: No Business Standard Journalist was involved in creation of this content
You’ve reached your limit of {{free_limit}} free articles this month.
Subscribe now for unlimited access.
Already subscribed? Log in
Subscribe to read the full story →
Smart Quarterly
₹900
3 Months
₹300/Month
Smart Essential
₹2,700
1 Year
₹225/Month
Super Saver
₹3,900
2 Years
₹162/Month
Renews automatically, cancel anytime
Here’s what’s included in our digital subscription plans
Exclusive premium stories online
Over 30 premium stories daily, handpicked by our editors


Complimentary Access to The New York Times
News, Games, Cooking, Audio, Wirecutter & The Athletic
Business Standard Epaper
Digital replica of our daily newspaper — with options to read, save, and share


Curated Newsletters
Insights on markets, finance, politics, tech, and more delivered to your inbox
Market Analysis & Investment Insights
In-depth market analysis & insights with access to The Smart Investor


Archives
Repository of articles and publications dating back to 1997
Ad-free Reading
Uninterrupted reading experience with no advertisements


Seamless Access Across All Devices
Access Business Standard across devices — mobile, tablet, or PC, via web or app
