Tender floated for major bridge on Tel river

Image
Press Trust of India Bhubaneswar
Last Updated : Feb 10 2019 | 3:30 PM IST

East Coast Railway (ECoR) Sunday said it has invited tender for a major bridge on Tel river as part of the 289-km Khurda Road-Balangir new line project.

The long-awaited rail line project, which was sanctioned in 1994-95, seeks to connect western Odisha with coastal parts of the state via Khurda, Nayagarh, Boudh, Sonepur and Balangir districts.

The proposed bridge over the Tel river, a major tributary of the Mahanadi near Sonepur town, will be built at an estimated cost of Rs 23 crore.

It is the longest bridge of the new line project, an ECoR statement said.

The confluence of Mahanadi River and Tel is about 2.50 km downstream from the proposed location of the bridge.

During peak flood, the rail bridge will have a lot of influence of Mahanadi due to merging of both the rivers in a very short distance without any appreciable bends, it said.

Keeping this in mind, it is proposed to provide 17 spans of 45.70 m each during the construction of the bridge, the statement said.

Rs 350 crore has been allocated in the interim budget this year for the Khurda Road-Balangir new rail line project.

About 66 km between Khurda Road and Nayagarh stations from Khurda Road side has been commissioned and the first stretch of 15 km from Balangir side has been completed.

Prime Minister Narendra Modi last month flagged off a train from Balangir side on the Balangir-Bichhupali route which would connect Bichhupali to Jharsuguda and Vizianagaram main line through Balangir.

The Odisha government has formed a joint venture with the Ministry of Railways to carry out the project.

The project is proposed to be completed by May 2021, sources said.

Disclaimer: No Business Standard Journalist was involved in creation of this content

*Subscribe to Business Standard digital and get complimentary access to The New York Times

Smart Quarterly

₹900

3 Months

₹300/Month

SAVE 25%

Smart Essential

₹2,700

1 Year

₹225/Month

SAVE 46%
*Complimentary New York Times access for the 2nd year will be given after 12 months

Super Saver

₹3,900

2 Years

₹162/Month

Subscribe

Renews automatically, cancel anytime

Here’s what’s included in our digital subscription plans

Exclusive premium stories online

  • Over 30 premium stories daily, handpicked by our editors

Complimentary Access to The New York Times

  • News, Games, Cooking, Audio, Wirecutter & The Athletic

Business Standard Epaper

  • Digital replica of our daily newspaper — with options to read, save, and share

Curated Newsletters

  • Insights on markets, finance, politics, tech, and more delivered to your inbox

Market Analysis & Investment Insights

  • In-depth market analysis & insights with access to The Smart Investor

Archives

  • Repository of articles and publications dating back to 1997

Ad-free Reading

  • Uninterrupted reading experience with no advertisements

Seamless Access Across All Devices

  • Access Business Standard across devices — mobile, tablet, or PC, via web or app

More From This Section

First Published: Feb 10 2019 | 3:30 PM IST

Next Story