BHEL commissions 363 MW power project in Tripura

With this commissioning, BHEL has commissioned nine modules of Frame 9FA gas turbines in the combined cycle mode in the country

BS B2B Bureau  |  Agartala, Tripura 

Bharat Heavy Electricals Limited (BHEL) has successfully commissioned the second module of the 2 x 363.3 MW gas-based combined cycle power plant (CCPP) of ONGC Thermal Power Corporation (OTPC) in Tripura. BHEL had commissioned the first module of the Palatana project in January 2103.
 
Located at Palatana, around 50 kms from Agartala, the CCPP comprises two modules of 363.3 MW each equipped with fuel efficient advanced class frame 9FA gas turbines. BHEL had won the contract for selling up the CCPP on EPC (engineering, procurement & construction) basis.
 
With the commissioning of this module, BHEL has commissioned nine modules of Frame 9FA Gas Turbines in the combined cycle mode, in the country.
 
BHEL has so far commissioned 911 Mw of gas-based and hydro sets in Tripura, which accounts for 100 per cent of the state's generating capacity. BHEL had earlier commissioned 14 gas turbines of smaller rating upto 21 Mw in Tripura as the sizes were limited by logistic constraint. The Palatana project is the first and the largest of its kind in the entire North-Eastern part of India. BHEL is also presently executing another gas-based project of 100 MW of NEEPCO at Monarchak in Tripura.

First Published: Tue, November 18 2014. 19:38 IST
RECOMMENDED FOR YOU

BHEL commissions 363 MW power project in Tripura

With this commissioning, BHEL has commissioned nine modules of Frame 9FA gas turbines in the combined cycle mode in the country

With this commissioning, BHEL has commissioned nine modules of Frame 9FA gas turbines in the combined cycle mode in the country Bharat Heavy Electricals Limited (BHEL) has successfully commissioned the second module of the 2 x 363.3 MW gas-based combined cycle power plant (CCPP) of ONGC Thermal Power Corporation (OTPC) in Tripura. BHEL had commissioned the first module of the Palatana project in January 2103.
 
Located at Palatana, around 50 kms from Agartala, the CCPP comprises two modules of 363.3 MW each equipped with fuel efficient advanced class frame 9FA gas turbines. BHEL had won the contract for selling up the CCPP on EPC (engineering, procurement & construction) basis.
 
With the commissioning of this module, BHEL has commissioned nine modules of Frame 9FA Gas Turbines in the combined cycle mode, in the country.
 
BHEL has so far commissioned 911 Mw of gas-based and hydro sets in Tripura, which accounts for 100 per cent of the state's generating capacity. BHEL had earlier commissioned 14 gas turbines of smaller rating upto 21 Mw in Tripura as the sizes were limited by logistic constraint. The Palatana project is the first and the largest of its kind in the entire North-Eastern part of India. BHEL is also presently executing another gas-based project of 100 MW of NEEPCO at Monarchak in Tripura.
image
Business Standard
177 22

BHEL commissions 363 MW power project in Tripura

With this commissioning, BHEL has commissioned nine modules of Frame 9FA gas turbines in the combined cycle mode in the country

Bharat Heavy Electricals Limited (BHEL) has successfully commissioned the second module of the 2 x 363.3 MW gas-based combined cycle power plant (CCPP) of ONGC Thermal Power Corporation (OTPC) in Tripura. BHEL had commissioned the first module of the Palatana project in January 2103.
 
Located at Palatana, around 50 kms from Agartala, the CCPP comprises two modules of 363.3 MW each equipped with fuel efficient advanced class frame 9FA gas turbines. BHEL had won the contract for selling up the CCPP on EPC (engineering, procurement & construction) basis.
 
With the commissioning of this module, BHEL has commissioned nine modules of Frame 9FA Gas Turbines in the combined cycle mode, in the country.
 
BHEL has so far commissioned 911 Mw of gas-based and hydro sets in Tripura, which accounts for 100 per cent of the state's generating capacity. BHEL had earlier commissioned 14 gas turbines of smaller rating upto 21 Mw in Tripura as the sizes were limited by logistic constraint. The Palatana project is the first and the largest of its kind in the entire North-Eastern part of India. BHEL is also presently executing another gas-based project of 100 MW of NEEPCO at Monarchak in Tripura.