L&T arm wins contract worth up to Rs 5,000 cr from Rail Vikas Nigam

The scope of the project includes construction of tunnels, formation, construction shaft, and other ancillary works between Rishikesh and Karanprayag

Larsen and Toubro
The project involves the construction of a 14.577-Km upline and a 13.123-Km downline tunnel with embankments of approximately 800 meters at both ends
Aditi Divekar Mumbai
2 min read Last Updated : Jan 18 2021 | 11:46 PM IST
The construction arm of L&T has secured a large order for its Heavy Civil Infrastructure business from Rail Vikas Nigam Limited (RVNL) for package-4 of the New Broad-Gauge Line between Rishikesh and Karanprayag in Uttarakhand.

In value terms, a large order is classified as order size between Rs 2,500-5,000 crore.

The scope of the project includes construction of tunnels, formation, construction shaft, and other ancillary works between Rishikesh and Karanprayag.

The project involves the construction of a 14.577-Km upline and a 13.123-Km downline tunnel with embankments of approximately 800 meters at both ends.

Of the 14.577-Km and 13.123-Km of tunnel work, 10.49 Km and 10.317 Km of tunnels will be excavated using two new hard rock Tunnel Boring Machines (TBMs) of diameter 9.1 meters and the balance using New Austrian Tunnel Method (NATM).

The scope also includes construction of an ellipsoidal-cum-ventilation shaft in the finished cross section of 79 square meters and depth of 32 meters. This will be the biggest TBM to be deployed in the Himalayan region in India and the TBM bored tunnel length of 20.807 Km will be the longest for any project in the Himalayan region. The entire project is to be completed within a stringent timeline of 60 months.

“Establishing a rail link between Rishikesh and Karanprayag will not only facilitate easy access to Uttarakhand’s pilgrimage sites, but also enable development of backward areas, connect new trade centres, and serve the resident population. The railway line traverses rugged Himalayan terrains, with the alignment oriented across and sometimes sub parallel to major thrust zones in the Himalayas with complex geological conditions,” company release quoted S.V. Desai, whole time director & senior executive vice president (civil infrastructure).

L&T is already constructing package-2 of this prestigious project involving 24 Kms of Tunnelling by the NATM, minor bridges and formation works.

One subscription. Two world-class reads.

Already subscribed? Log in

Subscribe to read the full story →
*Subscribe to Business Standard digital and get complimentary access to The New York Times

Smart Quarterly

₹900

3 Months

₹300/Month

SAVE 25%

Smart Essential

₹2,700

1 Year

₹225/Month

SAVE 46%
*Complimentary New York Times access for the 2nd year will be given after 12 months

Super Saver

₹3,900

2 Years

₹162/Month

Subscribe

Renews automatically, cancel anytime

Here’s what’s included in our digital subscription plans

Exclusive premium stories online

  • Over 30 premium stories daily, handpicked by our editors

Complimentary Access to The New York Times

  • News, Games, Cooking, Audio, Wirecutter & The Athletic

Business Standard Epaper

  • Digital replica of our daily newspaper — with options to read, save, and share

Curated Newsletters

  • Insights on markets, finance, politics, tech, and more delivered to your inbox

Market Analysis & Investment Insights

  • In-depth market analysis & insights with access to The Smart Investor

Archives

  • Repository of articles and publications dating back to 1997

Ad-free Reading

  • Uninterrupted reading experience with no advertisements

Seamless Access Across All Devices

  • Access Business Standard across devices — mobile, tablet, or PC, via web or app

Topics :Larsen & Toubro (L&T)L&T construction armRail Vikas Nigam

Next Story