Proposal for longest road tunnel at Gurez, others in pipeline

If approved, it will be longest road tunnel in the country and almost double the size of the present record holder Chenani-Nashri tunnel

Image
Press Trust of India Srinagar
Last Updated : Feb 14 2016 | 10:27 AM IST
Border Roads Organisation (BRO) has submitted a Rs 9,000-crore proposal to the Centre for construction of a road tunnel in Jammu and Kashmir that will connect strategically important Gurez town along the Line of Control to the rest of the Valley throughout the year.

"We have submitted a proposal to the Ministry of Road Transport and Highways for construction of an 18-kilometre tunnel at Razdhan pass to connect Gurez with rest of the Valley through out the year," Chief Engineer BRO Brigadier A K Das told PTI.

If approved, it will be longest road tunnel in the country and almost double the size of the present record holder Chenani-Nashri tunnel (9.2 km) -- also in Jammu and Kashmir, which is expected to be completed later this year.

Gurez, a picturesque valley in Bandipora district, is located along LoC and remains cut off from rest of Kashmir during winter months due to heavy snowfall.

It is one of the many strategic areas of Kashmir -- in terms of defence as well as energy security -- as work is in progress on the Kishenganga Hydro Electric Project there.

Gurez has also been used as an infiltration route by militants coming from the Pakistan-occupied Kashmir.

Das said a feasibility study has already been conducted for the tunnel and, if constructed, it will be of huge help not only to defence forces but also the civilian population of the area. "It will improve connectivity leading to development of the area."

The BRO official said the organisation has also submitted proposal for three more strategically important tunnels to be constructed in the Valley.

"These include a 6.5-kilometre tunnel at Sadhna that will improve the connectivity with the Tangdhar area (along the LoC) in Kupwara district, another at Furkian (Keran Sector) and a 3.5-km tunnel at Zamindar Gali (Macchil Sector)," he said.

Brig Das said feasibility studies will be conducted on these three projects after the approval from the Union Ministry.

Tangdhar, Keran and Macchil areas of Kupwara district fall along the Line of Control and also remain cut off from from rest of the state due to heavy snowfall during winter.
*Subscribe to Business Standard digital and get complimentary access to The New York Times

Smart Quarterly

₹900

3 Months

₹300/Month

SAVE 25%

Smart Essential

₹2,700

1 Year

₹225/Month

SAVE 46%
*Complimentary New York Times access for the 2nd year will be given after 12 months

Super Saver

₹3,900

2 Years

₹162/Month

Subscribe

Renews automatically, cancel anytime

Here’s what’s included in our digital subscription plans

Exclusive premium stories online

  • Over 30 premium stories daily, handpicked by our editors

Complimentary Access to The New York Times

  • News, Games, Cooking, Audio, Wirecutter & The Athletic

Business Standard Epaper

  • Digital replica of our daily newspaper — with options to read, save, and share

Curated Newsletters

  • Insights on markets, finance, politics, tech, and more delivered to your inbox

Market Analysis & Investment Insights

  • In-depth market analysis & insights with access to The Smart Investor

Archives

  • Repository of articles and publications dating back to 1997

Ad-free Reading

  • Uninterrupted reading experience with no advertisements

Seamless Access Across All Devices

  • Access Business Standard across devices — mobile, tablet, or PC, via web or app

More From This Section

First Published: Feb 14 2016 | 10:22 AM IST

Next Story