At present, the state-run mining major does not have any operations in Rowghat that contains the second largest iron ore deposits in Chhattisgarh after the Bailadila Iron Ore Mine. Rowghat Mines' reserves have been assessed at 731.93 million tonnes while Bailadila has an estimated reserve of 1.343 billion tonnes.
In a move aimed at evacuating minerals from Rowghat where the Left Wing Extremists had a considerable sway, a 235-km long rail line has been proposed to be connecting Dalli-Rajhara and Jagdalpur via Rowghat. The project is to be implemented in two phases; the 95 km line linking Dalli-Rajhara to Rowghat Mines in first phase and its extension till Jagdalpur which is located 140 km south of Rowghat in the second.
The construction cost of the first phase would be borne entirely by the Steel Authority of India Limited (SAIL), which had been allotted Deposit F having an estimated reserve of 511 million tonne. The mine is crucial for the SAIL as the reserve in Dalli-Rajhara that is feeding raw material to its flagship entity Bhilai Steel Plant (BSP) is fast depleting.
The Chhattisgarh government has formed a Special Purpose Vehicle (SPV) to implement the second phase of the project. The NMDC would hold 43% stake in the company while IRCON would have 26%, SAIL 21% and Chhattisgarh Mineral Development Corporation (CMDC) 10%. The project would be built with an investment cost of over Rs 2000 crore.
While the SAIL has a business interest in the project that would ferry iron-ore to Bhilai, country’s largest iron ore producer and exporter NMDC would be investing as part of long drawn strategy. As of now, NMDC had a single evacuation route; transporting iron-ore to Visakhapatnam port through the Kirandul-Vizag line. From the port, the mineral is disposed to different destinations.
“If the NMDC is investing such a huge amount, there must be some plan on card,” company spokesperson told Business Standard. The Rowghat rail line (that would finally connect to Howrah-Mumbai rail line) would help NMDC to increase its business in the eastern market. The route would help delivery time consumption.
Besides, the company is also setting up 3 million tonne steel plant in Nagarnaar. “The rail line would help in the evacuation of steel conveniently to the northern and eastern market,” the spokesperson said.
You’ve reached your limit of {{free_limit}} free articles this month.
Subscribe now for unlimited access.
Already subscribed? Log in
Subscribe to read the full story →
Smart Quarterly
₹900
3 Months
₹300/Month
Smart Essential
₹2,700
1 Year
₹225/Month
Super Saver
₹3,900
2 Years
₹162/Month
Renews automatically, cancel anytime
Here’s what’s included in our digital subscription plans
Exclusive premium stories online
Over 30 premium stories daily, handpicked by our editors


Complimentary Access to The New York Times
News, Games, Cooking, Audio, Wirecutter & The Athletic
Business Standard Epaper
Digital replica of our daily newspaper — with options to read, save, and share


Curated Newsletters
Insights on markets, finance, politics, tech, and more delivered to your inbox
Market Analysis & Investment Insights
In-depth market analysis & insights with access to The Smart Investor


Archives
Repository of articles and publications dating back to 1997
Ad-free Reading
Uninterrupted reading experience with no advertisements


Seamless Access Across All Devices
Access Business Standard across devices — mobile, tablet, or PC, via web or app
)