Triveni Turbines takes US-based GE to NCLT alleging misconduct in JV

GE is in JV with Triveni Turbines, arm of Triveni Engineering for making steam turbines in 30-100 MW range

Steam Turbine.Photo: Wikimedia Commons
Representative Image. Photo: Wikimedia Commons
Aashish Aryan New Delhi
2 min read Last Updated : Jul 01 2019 | 8:14 PM IST
Triveni Engineering and Industries arm Triveni Turbines has taken US-based General Electric (GE) to the National Company Law Tribunal (NCLT) alleging misconduct by the latter in the Joint Venture (JV) between the two. The Bengaluru bench of NCLT has admitted the petition and will next hear the matter on July 9. In the interim, the NCLT has also barred GE from selling its stake in the JV to any third party until the matter is heard and disposed-off.

Triveni Turbines had entered into an equal partnership JV with GE to form GE Triveni, which would engage in the business of manufacturing of steam turbines for power generation in industrial and utility projects. Triveni Turbines had, while entering into the JV, said that it would look to enter the 30- 100 MW steam turbine engine range with help from GE’s technology.

In its petition before the NCLT, Triveni Turbines has alleged that GE did not transfer the said technology to Triveni, which caused loss to the company. GE and its nominee directors on the board of the JV GE-Triveni acted in a manner that was “harsh, burdensome and wrongful” to Triveni Turbines. Citing a McCoy report of 2018, Triveni Turbine further alleges that sold steam turbine engines in the 30-100 MW range without the JV’s knowledge.  

Other than not sharing the technology, Triveni alleged that GE had also acquired another company named Alstom, which was a direct competition. GE also transferred business opportunities that should have ideally come to the JV GE-Triveni to its other companies and arms which caused harm to the latter, Triveni Turbines has alleged in its petition before the NCLT.

Citing one such instance, Triveni Turbines has said that when there was an enquiry from the Union Flacq Power Plant of Mauritius, GE, instead of redirecting the business towards the JV it had with Triveni, chose to bid for the projects itself.

“The petitioner (Triveni Turbines) was shocked to learn that the policy provided for allocation of various enquiries (falling within the output range of the company) GE Power Steam Power Systems GE Oil and Gas Downstream Products and Services,” the company has said in its petition.

One subscription. Two world-class reads.

Already subscribed? Log in

Subscribe to read the full story →
*Subscribe to Business Standard digital and get complimentary access to The New York Times

Smart Quarterly

₹900

3 Months

₹300/Month

SAVE 25%

Smart Essential

₹2,700

1 Year

₹225/Month

SAVE 46%
*Complimentary New York Times access for the 2nd year will be given after 12 months

Super Saver

₹3,900

2 Years

₹162/Month

Subscribe

Renews automatically, cancel anytime

Here’s what’s included in our digital subscription plans

Exclusive premium stories online

  • Over 30 premium stories daily, handpicked by our editors

Complimentary Access to The New York Times

  • News, Games, Cooking, Audio, Wirecutter & The Athletic

Business Standard Epaper

  • Digital replica of our daily newspaper — with options to read, save, and share

Curated Newsletters

  • Insights on markets, finance, politics, tech, and more delivered to your inbox

Market Analysis & Investment Insights

  • In-depth market analysis & insights with access to The Smart Investor

Archives

  • Repository of articles and publications dating back to 1997

Ad-free Reading

  • Uninterrupted reading experience with no advertisements

Seamless Access Across All Devices

  • Access Business Standard across devices — mobile, tablet, or PC, via web or app

Topics :Triveni Engineering and Industries

Next Story