The Tamil Nadu government will take up a flood-mitigation project in Chenani city at an outlay of Rs 1,447 crore under the Jawaharlal Nehru National Urban Renewal Mission (JNNURM). The project envisages construction of new micro- and macro-drainage systems in four basins and making improvements to the existing drainage system.
With this, the city hopes to overcome the threat of inundation of its low-lying areas during the north-east monsoon each year, and possible loss of lives.
Public Works Department (PWD) principal secretary S Ramasundaram said the Chennai Corporation would improve the city’s drainage at a cost of Rs 815 crore. The PWD’s ten schemes would cost Rs 633.3 crore. The corporation has already started the work.
He added his department had finalised tenders for seven schemes costing Rs 533 crore and works were expected to be completed in two years.
“As land acquisition would take a minimum of one year for the three remaining schemes costing Rs 100 crore, they could take three years for completion as the government is keen on resettling the encroachers before evicting them,” he said.
Apart from spending Rs 304 crore on improvement works in Buckingham Canal, the PWD would construct a connecting canal between Otteri Nullah and the Cooum river at a cost of Rs 9.87 crore. Another connecting canal would be built at a cost of Rs 25 crore to divert surplus water from Virugambakkam and Arumbakkam canals into the Cooum.
PWD will also spend another Rs 58 crore to take surplus water from the Velachery lake to South Buckingham canal and another Rs 53 crore for a new canal to divert flood water from Okkiyam Madu to the Bay of Bengal.
Improvement works to divert surplus water would be taken up at Ambattur, Porur and Maduravoyal lakes at a cost of Rs 62 crore.
The Otteri Nullah would be desilted and strengthened at a cost of Rs 33 crore. Virugambakkam and Arumbakkam canals would be widened and strengthened at a cost of Rs 40.83 crore.
You’ve reached your limit of {{free_limit}} free articles this month.
Subscribe now for unlimited access.
Already subscribed? Log in
Subscribe to read the full story →
Smart Quarterly
₹900
3 Months
₹300/Month
Smart Essential
₹2,700
1 Year
₹225/Month
Super Saver
₹3,900
2 Years
₹162/Month
Renews automatically, cancel anytime
Here’s what’s included in our digital subscription plans
Exclusive premium stories online
Over 30 premium stories daily, handpicked by our editors


Complimentary Access to The New York Times
News, Games, Cooking, Audio, Wirecutter & The Athletic
Business Standard Epaper
Digital replica of our daily newspaper — with options to read, save, and share


Curated Newsletters
Insights on markets, finance, politics, tech, and more delivered to your inbox
Market Analysis & Investment Insights
In-depth market analysis & insights with access to The Smart Investor


Archives
Repository of articles and publications dating back to 1997
Ad-free Reading
Uninterrupted reading experience with no advertisements


Seamless Access Across All Devices
Access Business Standard across devices — mobile, tablet, or PC, via web or app
