Rs 3 bn railway plan aims to fill coaches with water in 5 minutes

With the use of quick watering system, a 24-coach train can be filled up within five minutes and multiple trains can be simultaneously watered at the same time

Railways
Press Trust of India New Delhi
Last Updated : Dec 09 2018 | 3:42 PM IST

Don't want to miss the best from Business Standard?

Water woes onboard trains will soon be a thing of the past with railways at set to introduce a system which will reduce water filling time from the existing 20 minutes to just five minutes at stations.

The Railways will introduce the system in March next year at over 142 stations which have the water filling system for trains.

Recently the rail board sanctioned Rs 3 billion for the project.

According to the plan prepared by railways, water in long-distance trains which are used in toilets and washbasins are filled every 300-400 km, even if they are not empty, to ensure that there is adequate water in the coaches.

With the use of quick watering system, a 24-coach train can be filled up within five minutes and multiple trains can be simultaneously watered at the same time.
 

"Earlier the water in the coaches were filled with the help of four-inch pipes. These would now be replaced with six-inch pipes with high power motors and the water would be supplied to the train coaches through a computerised system called SCADA (Supervisory Control And Data Acquisition), designed by RDSO," said Railway Board Member (Rolling Stock) Rajesh Agarwal.

The old pipes, the document said did not have enough pressure and took around 20 minutes to fill the tanks with capacity of 1,800 litre of water in a coach, which resulted in shortages.

A senior official of the ministry said that the national transporter receives a lot of complaints about inadequate water in coaches and this system would ensure that there will be no water shortage in trains because the time to fill up the tanks was minimal.
 

"It took so much time that it was difficult to fill enough water at watering stops. Now, there will not be water shortage," the official said.

He said the ministry has planned to install pumps of 40 horsepower to increase the water pressure.

*Subscribe to Business Standard digital and get complimentary access to The New York Times

Smart Quarterly

₹900

3 Months

₹300/Month

SAVE 25%

Smart Essential

₹2,700

1 Year

₹225/Month

SAVE 46%
*Complimentary New York Times access for the 2nd year will be given after 12 months

Super Saver

₹3,900

2 Years

₹162/Month

Subscribe

Renews automatically, cancel anytime

Here’s what’s included in our digital subscription plans

Exclusive premium stories online

  • Over 30 premium stories daily, handpicked by our editors

Complimentary Access to The New York Times

  • News, Games, Cooking, Audio, Wirecutter & The Athletic

Business Standard Epaper

  • Digital replica of our daily newspaper — with options to read, save, and share

Curated Newsletters

  • Insights on markets, finance, politics, tech, and more delivered to your inbox

Market Analysis & Investment Insights

  • In-depth market analysis & insights with access to The Smart Investor

Archives

  • Repository of articles and publications dating back to 1997

Ad-free Reading

  • Uninterrupted reading experience with no advertisements

Seamless Access Across All Devices

  • Access Business Standard across devices — mobile, tablet, or PC, via web or app

More From This Section

First Published: Dec 09 2018 | 1:11 PM IST

Next Story