'Hyderabad can generate 1,730 MW rooftop solar power'

Image
IANS Hyderabad
Last Updated : Apr 11 2018 | 7:00 PM IST

With a potential of 1,730 MW power generation through rooftop solar panels, Hyderabad can become solar champion in India, thereby reduce air pollution by cutting on coal-based power, according to a study.

The study, jointly undertaken by Greenpeace India and Gujarat Energy Research and Management Institute (GERMI), stated that if achieved, Hyderabad can reduce its power demand by almost 15 per cent.

"A big share of this (1,730 MW), nearly 70 per cent, can come from the residential sector... For residents, solar makes for a solid investment, and would cut down on electricity bills considerably," said the report 'Rooftop Revolution: Unleashing Hyderabad's Rooftop Potential'.

The study scanned the area in Greater Hyderabad Municipal Corporation (GHMC) and estimates an average of 2.70 MW per sq. km. can easily be generated through installing rooftop solar panels.

"The city is blessed with quite a few major landmarks that have sizable potential for rooftop solar power generation," the report said.

Some of the major regions with huge solar rooftop potentioan according to the study includes, buildings of Osmania University (over 5,100 KW), Begumpet and Rajiv Gandhi International Airports (over 700 KW), the city's railway stations (3,187 KW), metro stations(679 KW), all bus depots (nearly 3,000 KW).

According to records, Hyderabad has the highest annual Particulate Matter (PM) levels of Telangana's 11 districts and cities.

"Switching to solar will not only help Hyderabad reduce air pollution by bringing down its dependence on coal as a source of power, but also help policy makers to the India's overall rooftop solar goal of 40 GW by 2022," said Pujarini Sen, Climate and Energy Campaigner, Greenpeace India.

According to Akhilesh Magal, Head, Advisory, Renewable Energy, Environment and Energy Efficiency, GERMI while Telangana already has a rooftop solar policy what's required is a goal to help determine a market size.

As of December 2017, only six out of 29 states and seven Union Territories are complying with the Central government's Renewable Energy Purchase Obligation (RPO) targets.

Telangana has 1,868.17 MW of renewable energy installed, which is just 40 per cent of the target, lagging behind Kerala, Tamil Nadu, Karnataka and Andhra Pradesh.

--IANS

kd/pgh/vm

Disclaimer: No Business Standard Journalist was involved in creation of this content

*Subscribe to Business Standard digital and get complimentary access to The New York Times

Smart Quarterly

₹900

3 Months

₹300/Month

SAVE 25%

Smart Essential

₹2,700

1 Year

₹225/Month

SAVE 46%
*Complimentary New York Times access for the 2nd year will be given after 12 months

Super Saver

₹3,900

2 Years

₹162/Month

Subscribe

Renews automatically, cancel anytime

Here’s what’s included in our digital subscription plans

Exclusive premium stories online

  • Over 30 premium stories daily, handpicked by our editors

Complimentary Access to The New York Times

  • News, Games, Cooking, Audio, Wirecutter & The Athletic

Business Standard Epaper

  • Digital replica of our daily newspaper — with options to read, save, and share

Curated Newsletters

  • Insights on markets, finance, politics, tech, and more delivered to your inbox

Market Analysis & Investment Insights

  • In-depth market analysis & insights with access to The Smart Investor

Archives

  • Repository of articles and publications dating back to 1997

Ad-free Reading

  • Uninterrupted reading experience with no advertisements

Seamless Access Across All Devices

  • Access Business Standard across devices — mobile, tablet, or PC, via web or app

More From This Section

First Published: Apr 11 2018 | 6:52 PM IST

Next Story