The Indian space agency will decide on the need for a second rocket launch site after doing a detailed study on the cost-benefit and other aspects like the trend in remote sensing satellites, said its chief Monday.
"A study is being undertaken on the need for a second launch site and the report is expected in couple of months," Indian Space Research Organisation (ISRO) chairman K.Radhakrishnan told IANS.
DMK president M.Karunanidhi has been demanding building of second rocket launch site at Kulasekarapattinam in Tamil Nadu's Tuticorin district as it is an ideal location and could save rocket fuel or increase the rocket's carrying capacity.
"A rocket launch site should be on the east coast and near the equator. And Tuticorin district satisfies that condition," a former ISRO official told IANS.
A senior ISRO official, who did not want to be identified, told IANS that Tuticorin is a good location for a rocket that needs to fly towards south. "As a matter of fact, long back Tuticorin was considered for locating a rocket launch site but the locals opposed it."
Radhakrishnan said that for all eastward launches, the current site at Sriharikota is the best.
"We send the remote sensing (earth observation) satellites southwards. But the global trend in the remote sensing satellites is reduction in their size."
"The size of remote sensing satellites is coming down while that of communication satellites is going up. A new rocket launch site for remote sensing satellites, normally launched southwards, has to take into account the capital expenditure involved and the savings in fuel burnt by the rocket. For launching communication satellites the current site is the best," he added.
According to him, a study is being undertaken on constructing third launch pad at Sriharikota capable of launching upgraded geosynchronous satellite launch vehicle (GSLV) Mark III.
Meanwhile, ISRO has decided to construct a new rocket assembly building in order to increase the frequency of rocket/satellite launches and use the exiting two launch pads effectively, he said.
At present, ISRO has two rocket assembly facilities and two launch pads at its Satish Dhawan Space Centre in Sriharikota.
It needs over a month's time to ready a launch pad after each rocket blast-off.
During the 12th Plan Period, the Indian space agency has planned 58 missions for realization -- 33 satellite missions and 25 launch vehicle missions (17 PSLV, six GSLV Mark II missions and two GSLV Mark III including the experimental one).
ISRO officials told IANS that there is sufficient land at Sriharikota for building the new launch pad and other facilities.
(Venkatachari Jagannathan can be contacted at v.jagannathan@ians.in)
You’ve reached your limit of {{free_limit}} free articles this month.
Subscribe now for unlimited access.
Already subscribed? Log in
Subscribe to read the full story →
Smart Quarterly
₹900
3 Months
₹300/Month
Smart Essential
₹2,700
1 Year
₹225/Month
Super Saver
₹3,900
2 Years
₹162/Month
Renews automatically, cancel anytime
Here’s what’s included in our digital subscription plans
Exclusive premium stories online
Over 30 premium stories daily, handpicked by our editors


Complimentary Access to The New York Times
News, Games, Cooking, Audio, Wirecutter & The Athletic
Business Standard Epaper
Digital replica of our daily newspaper — with options to read, save, and share


Curated Newsletters
Insights on markets, finance, politics, tech, and more delivered to your inbox
Market Analysis & Investment Insights
In-depth market analysis & insights with access to The Smart Investor


Archives
Repository of articles and publications dating back to 1997
Ad-free Reading
Uninterrupted reading experience with no advertisements


Seamless Access Across All Devices
Access Business Standard across devices — mobile, tablet, or PC, via web or app
