The minister stressed that the economies of scale like in the case of LED bulb distribution programme, would help the nation to adopt better technologies at competitive rates without any subsidy.
"I believe that as we scale it up the cost will come down and we will get better technology in the system, and for more practical implementation we will not need any subsidies or incentives. It would be an economic benefit itself," Goyal said at the launch of Energy Conservation Building Code (ECBC) 2017 here.
Certain section of media were expecting that the government would introduce cheaper loans and stamp duties for green buildings to boost energy conservation in various types of buildings in the country.
"I personally feel that there should be no (government) support and make it economically viable through India's sheer size and scale," the minister said.
On lower stamp duty incentive for green buildings, Goyal said if states want to give some incentives then they are free to give that.
The Bureau of Energy Efficiency (BEE) prescribes the energy performance standards for new commercial buildings to be constructed across India.
In order for a building to be considered ECBC-compliant, it would need to demonstrate minimum energy savings of 25 per cent. Additional improvements in energy efficiency performance would enable the new buildings to achieve higher grades like ECBC Plus or Super ECBC status leading to further energy savings of 35 and 50 per cent, respectively.
With the adoption of ECBC 2017 for new commercial building construction throughout the country, it is estimated to achieve a 50 per cent reduction in energy use by 2030.
On the stressed power projects, the minister said, "We just had preliminary discussion with bankers. We will have to have a very good technical assessments done so that more realistic solution is found so that we don't face hiccups as we
go along, as in the case of Teesta project".
On Hydro power policy to revive stalled projects he said, "We will try to expedite so that those projects which are not found economically viable but technically feasible be a part of the hydro electric story of India".
Disclaimer: No Business Standard Journalist was involved in creation of this content
You’ve reached your limit of {{free_limit}} free articles this month.
Subscribe now for unlimited access.
Already subscribed? Log in
Subscribe to read the full story →
Smart Quarterly
₹900
3 Months
₹300/Month
Smart Essential
₹2,700
1 Year
₹225/Month
Super Saver
₹3,900
2 Years
₹162/Month
Renews automatically, cancel anytime
Here’s what’s included in our digital subscription plans
Exclusive premium stories online
Over 30 premium stories daily, handpicked by our editors


Complimentary Access to The New York Times
News, Games, Cooking, Audio, Wirecutter & The Athletic
Business Standard Epaper
Digital replica of our daily newspaper — with options to read, save, and share


Curated Newsletters
Insights on markets, finance, politics, tech, and more delivered to your inbox
Market Analysis & Investment Insights
In-depth market analysis & insights with access to The Smart Investor


Archives
Repository of articles and publications dating back to 1997
Ad-free Reading
Uninterrupted reading experience with no advertisements


Seamless Access Across All Devices
Access Business Standard across devices — mobile, tablet, or PC, via web or app
