According to DMRC, the solar panels will produce a total of 225 KW (kilo watt) power, whose installation will be completed in next few months.
Prime Minister Narendra Modi had acknowledged DMRC's efforts in generating renewable energy in his speech while inaugurating the 14-km long section earlier this month.
DMRC has so far installed solar power plants at all the stations of the section, an extension of the Violet Line (Line 6), and Ajronda Depot with a total generation capacity of 1.9 MWp.
DMRC has so far commissioned solar power facilities with generation capacity of approximately 2,800 KWp with plants at Dwarka Sector 21, Anand Vihar, Pragati Maidan, Metro Enclave, Yamuna bank station, Yamuna bank depot and ITO.
You’ve reached your limit of {{free_limit}} free articles this month.
Subscribe now for unlimited access.
Already subscribed? Log in
Subscribe to read the full story →
Smart Quarterly
₹900
3 Months
₹300/Month
Smart Essential
₹2,700
1 Year
₹225/Month
Super Saver
₹3,900
2 Years
₹162/Month
Renews automatically, cancel anytime
Here’s what’s included in our digital subscription plans
Exclusive premium stories online
Over 30 premium stories daily, handpicked by our editors


Complimentary Access to The New York Times
News, Games, Cooking, Audio, Wirecutter & The Athletic
Business Standard Epaper
Digital replica of our daily newspaper — with options to read, save, and share


Curated Newsletters
Insights on markets, finance, politics, tech, and more delivered to your inbox
Market Analysis & Investment Insights
In-depth market analysis & insights with access to The Smart Investor


Archives
Repository of articles and publications dating back to 1997
Ad-free Reading
Uninterrupted reading experience with no advertisements


Seamless Access Across All Devices
Access Business Standard across devices — mobile, tablet, or PC, via web or app
