The federal government will provide a USD 1.5 billion loan to restart a nuclear power plant in southwestern Michigan, officials announced on Wednesday.
Holtec International acquired the 800-megawatt Palisades plant in 2022 with plans to dismantle it. But now the emphasis is on restarting it by late 2025, following support from the state of Michigan and the Biden administration.
Gov. Gretchen Whitmer said it would be the first nuclear power plant to be reopened in the US.
It still faces hurdles, including inspections, testing and the blessing of the US Nuclear Regulatory Commission, known as the NRC.
Nuclear power is our single largest source of carbon-free electricity, directly supporting 100,000 jobs across the country and hundreds of thousands more indirectly, said Energy Secretary Jennifer Granholm, a former Michigan governor.
The Palisades plant is along Lake Michigan, a two-hour drive from Chicago. A Michigan utility, CMS Energy, owned it from 1971 until the plant was sold to Louisiana-based utility Entergy in 2007. It was shut down in 2022.
Holtec said it has long-term commitments so far from two electric cooperatives to buy power from the plant.
The repowering of Palisades will restore safe, around-the-clock generation to hundreds of thousands of households, businesses and manufacturers," said Kris Singh, Holtec president and chief executive.
Critics, however, have emerged. A coalition opposed to restarting what it derisively calls a zombie reactor has requested a hearing at the NRC.
Holtec spokesman Patrick O'Brien said it will take four to five months to finalize the financial deal with the government.
It is a loan we have to pay back, he said.
Nuclear energy is in the spotlight. Thirty-four countries, including the US, last week pledged to use it to reduce reliance on fossil fuels. In California, regulators in December said the Diablo Canyon plant could operate through 2030 instead of 2025 to guard against blackouts as the state shifts toward renewable power sources.
There is more enthusiasm toward nuclear power in Congress, in the industry and also internationally," said Najmedin Meshkati, an engineering professor at the University of Southern California who has inspected nuclear plants around the world.
But restarting a plant, he said, is not easy.
It puts the onus and burden on the Nuclear Regulatory Commission and Holtec to double down on efforts to make sure this plant is safe enough and all the safety measures are intact, Meshkati said of Palisades.
(Only the headline and picture of this report may have been reworked by the Business Standard staff; the rest of the content is auto-generated from a syndicated feed.)
You’ve reached your limit of {{free_limit}} free articles this month.
Subscribe now for unlimited access.
Already subscribed? Log in
Subscribe to read the full story →
Smart Quarterly
₹900
3 Months
₹300/Month
Smart Essential
₹2,700
1 Year
₹225/Month
Super Saver
₹3,900
2 Years
₹162/Month
Renews automatically, cancel anytime
Here’s what’s included in our digital subscription plans
Exclusive premium stories online
Over 30 premium stories daily, handpicked by our editors


Complimentary Access to The New York Times
News, Games, Cooking, Audio, Wirecutter & The Athletic
Business Standard Epaper
Digital replica of our daily newspaper — with options to read, save, and share


Curated Newsletters
Insights on markets, finance, politics, tech, and more delivered to your inbox
Market Analysis & Investment Insights
In-depth market analysis & insights with access to The Smart Investor


Archives
Repository of articles and publications dating back to 1997
Ad-free Reading
Uninterrupted reading experience with no advertisements


Seamless Access Across All Devices
Access Business Standard across devices — mobile, tablet, or PC, via web or app
)