A lotus-shaped landing field: GVK group reveals Navi Mumbai airport design

The airport will be developed in four phases. After the first phase it will be able to handle a minimum of 10 million passengers

Navi Mumbai International Airport
The airport will be developed in four phases. After the first phase, it will be able to handle a minimum of 10 mn passengers
Aneesh Phadnis Mumbai
2 min read Last Updated : Jun 09 2021 | 11:36 PM IST
The Navi Mumbai international airport will boast three interconnect­ed multi-level terminals with a lotus-inspired design, according to the master plan prepared by its outgoing developer.
 
The GVK group, which completed 15 years of airport business, shared the first look of the Navi Mumbai airport on Tuesday.
 
The group in 2018 had comm­iss­ioned British firm Zaha Hadid Architects to design the main terminal and air traffic control tower. The master plan of the airport was approved by the City and Industrial Development Corporation (CIDCO) in 2019.
 
The airport will be developed in four phases. After the first phase it will be able to handle a minimum of 10 million passengers. According to the master plan, the airport’s main terminal (T1) that will be built in phase one would have two floors with very few level changes and minimum walking distances. The airport would eventually have a passen­ger handling capacity of 90 million per year.
 
The airport will be built over 1,160 hectares, over 95 per cent of which has been acquired from local villagers. Hill cutting and land filling works are on. The site had a cluster of villages with ponds full of lotuses and that inspired the terminal design.
 
Last August, the GVK group announced an exit from the airport sector selling its stake in Mumbai airport to the Adani group. The actual handover is, however, yet to happen.
 
According to the concession agreement between CIDCO and GVK, the date of commercial operations of the Navi Mumbai airport was fixed at this year-end. This would need to be amended. Also, given the changed business environment and sharp fall in traffic last year, the Adani group may review and revisit the construction plans.
 
Both Adani and GVK groups declined to respond to queries on the matter.






One subscription. Two world-class reads.

Already subscribed? Log in

Subscribe to read the full story →
*Subscribe to Business Standard digital and get complimentary access to The New York Times

Smart Quarterly

₹900

3 Months

₹300/Month

SAVE 25%

Smart Essential

₹2,700

1 Year

₹225/Month

SAVE 46%
*Complimentary New York Times access for the 2nd year will be given after 12 months

Super Saver

₹3,900

2 Years

₹162/Month

Subscribe

Renews automatically, cancel anytime

Here’s what’s included in our digital subscription plans

Exclusive premium stories online

  • Over 30 premium stories daily, handpicked by our editors

Complimentary Access to The New York Times

  • News, Games, Cooking, Audio, Wirecutter & The Athletic

Business Standard Epaper

  • Digital replica of our daily newspaper — with options to read, save, and share

Curated Newsletters

  • Insights on markets, finance, politics, tech, and more delivered to your inbox

Market Analysis & Investment Insights

  • In-depth market analysis & insights with access to The Smart Investor

Archives

  • Repository of articles and publications dating back to 1997

Ad-free Reading

  • Uninterrupted reading experience with no advertisements

Seamless Access Across All Devices

  • Access Business Standard across devices — mobile, tablet, or PC, via web or app

Topics :GVKNavi MumbaiMumbai airport

Next Story