The demand and realisation for the steel segment remains weak. The power segment, too, continues to see weak realisation. JSPL, in its conference call, indicated that power evacuation problems have been resolved, but not entirely, which resulted in the company selling 30% of its volume to power exchanges at a lower tariff compared to the normal market rates.
JSPL produced 7.9-lakh tonne of steel, while it sold 9.1-lakh tonne thereby liquidating excess inventory. Its earnings before interest and tax (EBIT) for the steel division came in 23% lower on a sequential basis even on higher volumes, reflecting sharp drop in realisation. “We are also concerned with a 4.3% sequential drop in power production volumes in the standalone business, suggesting that the 1,350MW project could be facing further issues stabilization issues,” notes Chirag Talati, an analyst at Barclays.
Soft prices
On steel realisation, the management stated that the company has liquidated its steel inventory which led to a 3 – 7% drop in steel prices and was of the view that steel prices have started showing a marginal uptrend since the beginning of April 2013. However, Giriraj Daga, an analyst at Nirmal Bang points out that the company sold an additional 2-lakh tonne over the normal run-rate and such a sharp price fall shows the extremely weak nature of the Indian steel market.
On the other hand, JSPL is expanding capacity in the power segment by commissioning the 2.4GW power project in stages by Q2FY15. Thus, the benefits from this expansion will take time to accrue. Analysts at Religare add that with most of JSPL’s expansion projects coming online only in the second half of the fiscal year, they expect a lacklustre FY14 for the company. Also, the dependence on imported/e-auction coal in the near-term and a rising debt profile are a concern. The project has been funded on the basis of 75:25 for debt to equity.
In this backdrop, analysts have trimmed their FY14 estimates for now. Daga of Nirmal Bang has revised his FY14 EBIDTA estimates downwards by 8% following a subdued performance in the recently concluded quarter, while the profit estimate has also been revised downwards by 10% primarily due to an around 5% cut in steel realisation. Analysts at Religare have also cut their earnings estimates and maintain HOLD with a revised target price of Rs 330 set at 7x FY15E EV/EBITDA.
You’ve reached your limit of {{free_limit}} free articles this month.
Subscribe now for unlimited access.
Already subscribed? Log in
Subscribe to read the full story →
Smart Quarterly
₹900
3 Months
₹300/Month
Smart Essential
₹2,700
1 Year
₹225/Month
Super Saver
₹3,900
2 Years
₹162/Month
Renews automatically, cancel anytime
Here’s what’s included in our digital subscription plans
Exclusive premium stories online
Over 30 premium stories daily, handpicked by our editors


Complimentary Access to The New York Times
News, Games, Cooking, Audio, Wirecutter & The Athletic
Business Standard Epaper
Digital replica of our daily newspaper — with options to read, save, and share


Curated Newsletters
Insights on markets, finance, politics, tech, and more delivered to your inbox
Market Analysis & Investment Insights
In-depth market analysis & insights with access to The Smart Investor


Archives
Repository of articles and publications dating back to 1997
Ad-free Reading
Uninterrupted reading experience with no advertisements


Seamless Access Across All Devices
Access Business Standard across devices — mobile, tablet, or PC, via web or app
)