Final killing operation to douse OIL's Baghjan well blaze underway

The well number 5 at Baghjan in Tinsukia district has been spewing gas uncontrollably since May 27 and it caught fire on June 9, killing two firefighters of the OIL at the site

Fire, Baghjan oil well
A BOP is a very heavy metal cover weighing several tonnes that is placed at the mouth of any gas or oil well to stop leakage of fuel from under the ground.
Press Trust of India Dibrugarh
2 min read Last Updated : Aug 18 2020 | 10:30 PM IST
Final killing operation is underway on Tuesday towards dousing the blaze at the damaged gas well of Oil India Limited (OIL) at Baghjan in Assam.

An OIL press release said, after Monday's successful capping operation, all arrangements for carrying out well- killing operation such as connections of kill lines and choke manifold lines have been completed.

"Final killing operation (pumping in mud with high pressure into the well) is underway," the press statement said on Tuesday.

The company, had on Monday said, it had successfully concluded the capping operation by installing the blow out preventive (BOP) stack over gas well No.5 at Baghjan.

A BOP is a very heavy metal cover weighing several tonnes that is placed at the mouth of any gas or oil well to stop leakage of fuel from under the ground.

The company could place the BOP over the Baghjan 5 gas wellhead in its third attempt since a major blowout took place on May 27.

The well number 5 at Baghjan in Tinsukia district has been spewing gas uncontrollably since May 27 and it caught fire on June 9, killing two firefighters of the OIL at the site.

A total of 2,756 families have been surveyed for assessment of damage for compensation till Monday in Doomdooma and Tinsukia Circle, the statement said.

"A total of 30,104 metric tonnes of crude oil and 71.01 million metric st. cubic metre of natural gas have been lost respectively as a result of protests/ blockades/ bandhs in and around Baghjan area since May 27 due to the blowout," the company said.

Data collection at site has been completed for Environmental Impact Assessment (EIA) study by various agencies, it said.

OILs in-house monitoring of air quality, noise level, gas presence is being continued. Bio re-mediation activities in the affected areas are also in progress, the release said.

One subscription. Two world-class reads.

Already subscribed? Log in

Subscribe to read the full story →
*Subscribe to Business Standard digital and get complimentary access to The New York Times

Smart Quarterly

₹900

3 Months

₹300/Month

SAVE 25%

Smart Essential

₹2,700

1 Year

₹225/Month

SAVE 46%
*Complimentary New York Times access for the 2nd year will be given after 12 months

Super Saver

₹3,900

2 Years

₹162/Month

Subscribe

Renews automatically, cancel anytime

Here’s what’s included in our digital subscription plans

Exclusive premium stories online

  • Over 30 premium stories daily, handpicked by our editors

Complimentary Access to The New York Times

  • News, Games, Cooking, Audio, Wirecutter & The Athletic

Business Standard Epaper

  • Digital replica of our daily newspaper — with options to read, save, and share

Curated Newsletters

  • Insights on markets, finance, politics, tech, and more delivered to your inbox

Market Analysis & Investment Insights

  • In-depth market analysis & insights with access to The Smart Investor

Archives

  • Repository of articles and publications dating back to 1997

Ad-free Reading

  • Uninterrupted reading experience with no advertisements

Seamless Access Across All Devices

  • Access Business Standard across devices — mobile, tablet, or PC, via web or app

Topics :OIL IndiaAssam

Next Story