ISRO successfully conducts key rocket engine test for Chandrayaan-3

"All the propulsion parameters during the test were found satisfactory and closely matched with predictions," an ISRO statement said

ISRO
"This test is a major milestone in the realisation of the satellites," ISRO had said.
Press Trust of India Bengaluru
2 min read Last Updated : Feb 28 2023 | 10:41 PM IST

The flight acceptance hot test of the CE-20 cryogenic engine that will power the cryogenic upper stage of the launch vehicle for the Chandrayaan-3 mission was successfully conducted, according to the Indian Space Research Organisation.

The hot test was carried out for a planned duration of 25 seconds at the High Altitude Test Facility of the ISRO Propulsion Complex at Mahendragiri in Tamil Nadu on February 24, the Bengaluru-headquartered national space agency said.

"All the propulsion parameters during the test were found satisfactory and closely matched with predictions," an ISRO statement said on Monday.

The cryogenic engine will be further integrated with the propellant tanks, stage structures and associated fluid lines to realise the fully-integrated flight cryogenic stage, ISRO said.

Earlier this year, Chandrayaan-3 lander successfully underwent EMI/EMC test at U R Rao Satellite Centre here.

EMI-EMC (Electro - Magnetic Interference/ Electro - Magnetic Compatibility) test is conducted for satellite missions to ensure the functionality of the satellite subsystems in the space environment and their compatibility with the expected electromagnetic levels, it was noted.

"This test is a major milestone in the realisation of the satellites," ISRO had said.

Chandrayaan-3 interplanetary mission has three major modules: the propulsion module, lander module, and a rover. The mission's complexity calls for establishing radio-frequency (RF) communication links between the modules.

During the Chandrayaan-3 lander EMI/EC test, launcher compatibility, antenna polarisation of all RF systems, standalone auto compatibility tests for orbital and powered descent mission phases, and lander and rover compatibility tests for post landing mission phase were ensured, according to ISRO.

Chandrayaan-3 is a follow-on mission to Chandrayaan-2 to demonstrate end-to-end capability in safe landing and roving on the lunar surface. ISRO plans to launch the mission in June.

It will be launched by Launch Vehicle Mark 3 (LVM3) from the Satish Dhawan Space Centre in Sriharikota (Andhra Pradesh).

The propulsion module will carry the lander and rover configuration till 100 km lunar orbit. The propulsion module has Spectro-polarimetry of Habitable Planet Earth (SHAPE) payload to study the spectral and polari metric measurements of Earth from the lunar orbit.

(Only the headline and picture of this report may have been reworked by the Business Standard staff; the rest of the content is auto-generated from a syndicated feed.)

*Subscribe to Business Standard digital and get complimentary access to The New York Times

Smart Quarterly

₹900

3 Months

₹300/Month

SAVE 25%

Smart Essential

₹2,700

1 Year

₹225/Month

SAVE 46%
*Complimentary New York Times access for the 2nd year will be given after 12 months

Super Saver

₹3,900

2 Years

₹162/Month

Subscribe

Renews automatically, cancel anytime

Here’s what’s included in our digital subscription plans

Exclusive premium stories online

  • Over 30 premium stories daily, handpicked by our editors

Complimentary Access to The New York Times

  • News, Games, Cooking, Audio, Wirecutter & The Athletic

Business Standard Epaper

  • Digital replica of our daily newspaper — with options to read, save, and share

Curated Newsletters

  • Insights on markets, finance, politics, tech, and more delivered to your inbox

Market Analysis & Investment Insights

  • In-depth market analysis & insights with access to The Smart Investor

Archives

  • Repository of articles and publications dating back to 1997

Ad-free Reading

  • Uninterrupted reading experience with no advertisements

Seamless Access Across All Devices

  • Access Business Standard across devices — mobile, tablet, or PC, via web or app

More From This Section

Topics :ISROChandrayaan-3test

First Published: Feb 28 2023 | 11:46 AM IST

Next Story