The ministry claims the high bids received in the tender could lead to a loss of Rs 200 crore to the exchequer.
In a letter to the Chhattisgarh State Renewable Energy Development Agency (CREDA), the ministry has raised concerns on the high bids, despite the tender using the same technical specifications as in the central bidding. The MNRE has said the Chhattisgarh tender received bids 40 per cent higher than received in the tender floated by EESL. Business Standard has reviewed the letter.
Several calls made to the CREDA office and the CEO did not elicit any response. State government officials said the department has no control over the bids placed by the private companies.
Senior MNRE officials said as the Centre wants a standardised price of solar pumps across the country, the ministry has asked the states to adopt the standard tender drafted by the ministry. “Some states like to offer their tender, while some procure via the EESL tender. But we have asked the state to follow same tender specifications. In the interest of the farmers, the cost of the pumps should come down gradually,” said the official.
CREDA had in May floated a tender for 20,000 solar pumps in the state, seeking the design, supply, installation, and commissioning of 3 HP and 5 HP (surface and submersible) capacity pumps, 10,000 each. The successful bidder will also have to take care of the operation and maintenance activities of the pumps for five years.
Under the KUSUM scheme, component B, which is for standalone solar pumps, the central financial assistance is 30 per cent of the benchmark cost or the tender cost, whichever is lower, state subsidy is 30 per cent and balance is paid by the farmer. In CREDA’s tender, the subsidy component is 90 per cent.
The MNRE, however, pointed out the same bidders have quoted lower bids in the EESL tender. The bidders that this paper spoke with said the CREDA tender had some minor tweaks such as the height of the system which impacted the cost.
EESL had in January issued a tender for off-grid/standalone solar pumps totalling 317,000 pumps to be set up across all states and Union Territories. But after the technical round, around a dozen companies that participated in the tender moved the Delhi High Court against the bidding process. The court has now directed the Union of India to respond to these allegations.
This is the second tender of solar pumps by EESL. It issued in 2019 a tender for off-grid solar water pump systems across India under the PM KUSUM to promote solar in agriculture. Under the tender, 181,200 solar pumps were slated to be installed in India.
One subscription. Two world-class reads.
Already subscribed? Log in
Subscribe to read the full story →
Smart Quarterly
₹900
3 Months
₹300/Month
Smart Essential
₹2,700
1 Year
₹225/Month
Super Saver
₹3,900
2 Years
₹162/Month
Renews automatically, cancel anytime
Here’s what’s included in our digital subscription plans
Exclusive premium stories online
Over 30 premium stories daily, handpicked by our editors


Complimentary Access to The New York Times
News, Games, Cooking, Audio, Wirecutter & The Athletic
Business Standard Epaper
Digital replica of our daily newspaper — with options to read, save, and share


Curated Newsletters
Insights on markets, finance, politics, tech, and more delivered to your inbox
Market Analysis & Investment Insights
In-depth market analysis & insights with access to The Smart Investor


Archives
Repository of articles and publications dating back to 1997
Ad-free Reading
Uninterrupted reading experience with no advertisements


Seamless Access Across All Devices
Access Business Standard across devices — mobile, tablet, or PC, via web or app
)