Paradeep port to commission multi-purpose berth by March 2019

The berth, capable of handling clean cargo including containers, is estimated to cost Rs 431 c

Paradeep Port
Paradeep Port
BS Reporter Bhubaneswar
Last Updated : Apr 06 2016 | 5:58 PM IST

Don't want to miss the best from Business Standard?

Paradeep Port Trust (PPT) expects to commission its proposed multi-purpose berth by March 2019. The berth, capable of handling clean cargo including containers, is estimated to cost Rs 430.78 crore.

PPT has already inked a concession agreement in March last year with Paradip International Cargo Terminal Pvt Ltd (PICT). It is a special purpose vehicle (SPV) set up by United Liner Agencies India Pvt Ltd which is a part of J M Baxi Group for construction/development of a multipurpose berth through public private partnership (PPP) mode on build, operate and transfer (BOT) basis in order to cater to the container traffic and clean cargo at Paradip port.

The non-hazardous and dust free cargoes including iron and steel products, aluminum ingots, pig iron, finished fertilisers, food grains, sugar (both raw and finished) would be handled effectively and efficiently in the multi-purpose berth.

The concessionaire would be responsible for financing, designing, construction, commissioning of the project along with operation, management and maintenance under the concession agreement. The concession period is 30 years.

Of the total estimated cost of Rs 430.78 crore, the contribution by the BOT operator is Rs 356.54 crore while PPT's component is Rs 74.24 crore towards capital dredging.

The draught of the proposed berth will be 16 metres with a length of 450 metres, which will facilitate handling of Capesize vessels up to 1,25,000 DWT (dead weight tonnage). The berth will be equipped with modern and efficient machineries equipment like mobile harbour cranes, rubber tyre gantry cranes, reach stackers and forklifts/payloaders. n completion of construction, five million tonne of cargo per annum shall be added to the capacity of the port.

PPT's ongoing projects also includes a deep draught iron ore berth to be built at a cost of Rs 740.19 crore. This berth, to be commissioned on BOT basis, is expected to be ready by March 2019. Besides this, the port is taking up mechanisation of EQ-I, EQ-II and EQ-III basis at an estimated cost of Rs 1,437.67 crore.

*Subscribe to Business Standard digital and get complimentary access to The New York Times

Smart Quarterly

₹900

3 Months

₹300/Month

SAVE 25%

Smart Essential

₹2,700

1 Year

₹225/Month

SAVE 46%
*Complimentary New York Times access for the 2nd year will be given after 12 months

Super Saver

₹3,900

2 Years

₹162/Month

Subscribe

Renews automatically, cancel anytime

Here’s what’s included in our digital subscription plans

Exclusive premium stories online

  • Over 30 premium stories daily, handpicked by our editors

Complimentary Access to The New York Times

  • News, Games, Cooking, Audio, Wirecutter & The Athletic

Business Standard Epaper

  • Digital replica of our daily newspaper — with options to read, save, and share

Curated Newsletters

  • Insights on markets, finance, politics, tech, and more delivered to your inbox

Market Analysis & Investment Insights

  • In-depth market analysis & insights with access to The Smart Investor

Archives

  • Repository of articles and publications dating back to 1997

Ad-free Reading

  • Uninterrupted reading experience with no advertisements

Seamless Access Across All Devices

  • Access Business Standard across devices — mobile, tablet, or PC, via web or app

More From This Section

First Published: Apr 06 2016 | 5:28 PM IST

Next Story