PFC invites bid for UMPP coal blocks consultant

PFC is the nodal agency for implementing UMPPs

Image
Jayajit Dash Bhubaneshwar
Last Updated : Feb 20 2014 | 8:31 PM IST
Amid the recent spate of de-allocation of coal blocks, PFC Consulting Ltd (PFCCL), a fully-owned subsidiary of Power Finance Corporation (PFC), has invited bids to select a consultant for developing coal blocks allocated for the Bhedabahal ultra mega power project (UMPP) in Odisha.

PFC is the nodal agency for implementing UMPPs. Meenakshi, Meenakshi-B and the dip side of Meenakshi blocks have been allocated for the 4,000 Mw plant to be built at Bhedabahal in western Odisha’s Sundargarh district.

“PFCCL wishes to avail the services of a consulting organisation to undertake consultancy assignment for the preparation of geological reports, mining plans, feasibility reports, EIA (environment impact assessment)/EMP (environment management plan) studies, land acquisition and forest clearance in respect of Meenakshi, Meenakshi-B and dip side of Meenakshi coal blocks,” PFCCL said in its bid document. The annual requirement of fuel for the Bhedabahal UMPP has been estimated at 19-20 million tonnes of coal.  

The coal from the allocated blocks would move from pit head to coal loading point at Dhuka chowk through a six-km belt conveyor system. After loading, the coal would be transported through an MGR (merry go round) system of about 64 km loop length (aerial distance of 31 km).

The total land requirement of developing the coal mines is 1,308 hectares (ha) — 492 ha for Menakshi, 486 ha for Meenakshi-B and 330 ha for dip side of Meenakshi coal blocks.

The coal block area involves 102 ha of reserve/ protected forest, 332 ha revenue forest, 236 ha of government land and 638 ha of private land.

Central Mine Planning & Design Institute, a fully-owned subsidiary of Coal India Ltd, has already carried out regional exploration in Meenakshi-B and dip side of Meenakshi coal block area.

The Request for Qualification for the UMPP was issued on September 25 last year. Odisha Integrated Power Ltd (OIPL) has received applications from nine prospective developers — Adani Power Ltd, CLP India Ltd, Jindal Power Ltd, JSW Energy Ltd, Larsen & Toubro Ltd, National Hydro Power Corporation Ltd, NTPC Ltd, Sterlite Infraventures Ltd and Tata Power Ltd.

OIPL had submitted a revised proposal for environment clearance in October 2013 . The proposal is under consideration of the Union Ministry of Environment & Forests. The selection of a bidder is being done according to the tariff-based competitive bidding guidelines issued by the central government on design, build, finance, own and transfer or DBFOT basis.
*Subscribe to Business Standard digital and get complimentary access to The New York Times

Smart Quarterly

₹900

3 Months

₹300/Month

SAVE 25%

Smart Essential

₹2,700

1 Year

₹225/Month

SAVE 46%
*Complimentary New York Times access for the 2nd year will be given after 12 months

Super Saver

₹3,900

2 Years

₹162/Month

Subscribe

Renews automatically, cancel anytime

Here’s what’s included in our digital subscription plans

Exclusive premium stories online

  • Over 30 premium stories daily, handpicked by our editors

Complimentary Access to The New York Times

  • News, Games, Cooking, Audio, Wirecutter & The Athletic

Business Standard Epaper

  • Digital replica of our daily newspaper — with options to read, save, and share

Curated Newsletters

  • Insights on markets, finance, politics, tech, and more delivered to your inbox

Market Analysis & Investment Insights

  • In-depth market analysis & insights with access to The Smart Investor

Archives

  • Repository of articles and publications dating back to 1997

Ad-free Reading

  • Uninterrupted reading experience with no advertisements

Seamless Access Across All Devices

  • Access Business Standard across devices — mobile, tablet, or PC, via web or app

More From This Section

First Published: Feb 20 2014 | 8:20 PM IST

Next Story