Tamil Nadu to set up 2 LNG power plants

Image
T E Narasimhan Chennai
Last Updated : Apr 09 2012 | 12:10 AM IST

The Tamil Nadu government is planning to set up two 500-Mw LNG-based power plants to address the electricity shortage in the state.

One of the plants would be set up near the five-million-tonne-per-annum Indian Oil Corporation terminal that was set up after a memorandum of understanding was signed. The second plant plans to take advantage of GAIL’s Kochi-Bangalore LNG pipeline, which passes through Tamil Nadu.

Both the projects will attract investments of around Rs 3,500 crore, according to experts.

It was estimated that the capital cost of a natural gas-based station in combined cycle is around Rs 3.5 crore per Mw.

The state, which is facing power cuts between two and 10 hours because of 4,000-Mw electricity shortage, is looking at all possibilities to address the shortage.

Speaking at the Assembly, Chief Minister J Jayalalithaa said the Centre was not providing enough coal for thermal power plants in the state. “So, we have to look at alternative sources like LNG”.

LNG power plants can be built in a shorter time than coal, she added.

According to Crisil, a new LNG-based power plant can be set up in 28-30 months, whereas conventional source, have gestation periods ranging from 48 to 84 months.

The research firm also said dedicated plants operating in open cycle in proximity to load centres can meet peak demand. LNG plants have about 50 per cent lesser emission than a coal-based station. The land and water requirements are also substantially lower.

The state government had on March 22, signed a memorandum of understanding with public sector IOC, which will attract investment of around Rs 10,000 crore.

The state government will look for land as close as possible to the terminal to set up the power plant.

*Subscribe to Business Standard digital and get complimentary access to The New York Times

Smart Quarterly

₹900

3 Months

₹300/Month

SAVE 25%

Smart Essential

₹2,700

1 Year

₹225/Month

SAVE 46%
*Complimentary New York Times access for the 2nd year will be given after 12 months

Super Saver

₹3,900

2 Years

₹162/Month

Subscribe

Renews automatically, cancel anytime

Here’s what’s included in our digital subscription plans

Exclusive premium stories online

  • Over 30 premium stories daily, handpicked by our editors

Complimentary Access to The New York Times

  • News, Games, Cooking, Audio, Wirecutter & The Athletic

Business Standard Epaper

  • Digital replica of our daily newspaper — with options to read, save, and share

Curated Newsletters

  • Insights on markets, finance, politics, tech, and more delivered to your inbox

Market Analysis & Investment Insights

  • In-depth market analysis & insights with access to The Smart Investor

Archives

  • Repository of articles and publications dating back to 1997

Ad-free Reading

  • Uninterrupted reading experience with no advertisements

Seamless Access Across All Devices

  • Access Business Standard across devices — mobile, tablet, or PC, via web or app

More From This Section

First Published: Apr 09 2012 | 12:10 AM IST

Next Story