The project aims at construction of 14.150 km long two lane bidirectional single tube tunnel with a parallel 14.200 km long egress tunnel between Baltaland Minamarg in the state of J&K. The total capital cost of the project is Rs 6808.69 crore. It includes the cost towards land acquisition, resettlement and rehabilitation and other pre-construction activities as well as maintenance and operation cost of the tunnel for four years. The civil construction cost of the project is Rs 4899.42 crore. The construction period of the project is seven years which shall be reckoned from the date of commencement of construction.
The tunnel will be an engineering marvel, a first of its kind in such geographical area. It will have all modern technical safety arrangements such as cut and cross ventilation system, two axial fans,, fully transverse ventilation system, uninterrupted power supply, CCTV monitoring, variable messaging boards, traffic logging equipment , tunnel radio, emergency telephone system etc.
The main objective of the project is to provide all whether connectivity to strategically important Leh region in Jammu & Kashmir which at the moment is limited to at best 6 months in a year because of snow on the passes and threat of avalanches. This project, along with other ongoing projects like 6.5 km long Z-Morh tunnel at Gagangir would ensure safe, fast and cheap connectivity between the two regions of Kashmir and Ladakh.
Speaking on the occasion Shri Nitin Gadkari, Minister of Road Transport & Highways, Shipping and Water Resources, River Development and Ganga Rejuvenation urged the construction company to make efforts to complete the project faster than the seven years assigned for it so that its benefits can reach the people of the region at the earliest. He also urged the company to explore whether it is technically feasible to lay railway tracks in the tunnel along with the road.
The projects will also increase the employment potential for the local labourers for the project activities. There would be enormous boost in employment as local businesses get linked to national market and the region is able to receive round the year tourist traffic.
Powered by Capital Market - Live News
Disclaimer: No Business Standard Journalist was involved in creation of this content
You’ve reached your limit of {{free_limit}} free articles this month.
Subscribe now for unlimited access.
Already subscribed? Log in
Subscribe to read the full story →
Smart Quarterly
₹900
3 Months
₹300/Month
Smart Essential
₹2,700
1 Year
₹225/Month
Super Saver
₹3,900
2 Years
₹162/Month
Renews automatically, cancel anytime
Here’s what’s included in our digital subscription plans
Exclusive premium stories online
Over 30 premium stories daily, handpicked by our editors


Complimentary Access to The New York Times
News, Games, Cooking, Audio, Wirecutter & The Athletic
Business Standard Epaper
Digital replica of our daily newspaper — with options to read, save, and share


Curated Newsletters
Insights on markets, finance, politics, tech, and more delivered to your inbox
Market Analysis & Investment Insights
In-depth market analysis & insights with access to The Smart Investor


Archives
Repository of articles and publications dating back to 1997
Ad-free Reading
Uninterrupted reading experience with no advertisements


Seamless Access Across All Devices
Access Business Standard across devices — mobile, tablet, or PC, via web or app
