Assembly bypoll is scheduled for Yercaud (SC) constituency in Salem district on December 4.
The memorandum alleged that the District Collector had laid the foundation stone for the construction of Omalur Taluk Office building at a cost of Rs 2.52 crore, in the presence of Salem DRO Selvaraj, Sub-Collector Anish Sekar, Omalur Tasildhar Azhagiri, Block Development Officer Malligeswari and Asst. Engineer, Public Works (Construction) Mohana.
"It is pertinent to note that the construction of Omalur Taluk Office Building was sanctioned long back and the tender was also finalised, but keeping the bypoll in mind, the District Collector had wantonly acted in favour of the ruling AIADMK Government and fixed the foundation stone laying function after the announcement of election," the memorandum alleged.
You’ve reached your limit of {{free_limit}} free articles this month.
Subscribe now for unlimited access.
Already subscribed? Log in
Subscribe to read the full story →
Smart Quarterly
₹900
3 Months
₹300/Month
Smart Essential
₹2,700
1 Year
₹225/Month
Super Saver
₹3,900
2 Years
₹162/Month
Renews automatically, cancel anytime
Here’s what’s included in our digital subscription plans
Exclusive premium stories online
Over 30 premium stories daily, handpicked by our editors


Complimentary Access to The New York Times
News, Games, Cooking, Audio, Wirecutter & The Athletic
Business Standard Epaper
Digital replica of our daily newspaper — with options to read, save, and share


Curated Newsletters
Insights on markets, finance, politics, tech, and more delivered to your inbox
Market Analysis & Investment Insights
In-depth market analysis & insights with access to The Smart Investor


Archives
Repository of articles and publications dating back to 1997
Ad-free Reading
Uninterrupted reading experience with no advertisements


Seamless Access Across All Devices
Access Business Standard across devices — mobile, tablet, or PC, via web or app
