DMRC starts tunnelling work from INA to South Ex

Image
Press Trust of India New Delhi
Last Updated : Oct 17 2013 | 6:41 PM IST
Delhi Metro Rail Corporation (DMRC) today started underground tunneling work between INA and South Extension on the Mukundpur-Shiv Vihar corridor as a part of its Phase-III.
The tunnelling work, which would cover a distance of 924 metre, was initiated by lowering the first Tunnel Boring Machine (TBM) at INA.
It will be part of Bhikaji Cama Place - Lajpat Nagar underground section of the Mukundpur-Shiv Vihar corridor.
The initial drive of this TBM after its full assembling at the site is expected to start in the first week of November.
DMRC will place 6,145 precast rings in a total tunneling drive of 4.299 km between Bhikaji Cama Place and Lajpat Nagar. The tunnel will have an internal diameter of 5.8 metre and width of 1.4 metre.
The underground stretch between Bhikaji Cama Place and Lajpat Nagar will witness a total of eight TBM launchings, including two each from INA to South Extension, from South Extension to Lajpat Nagar, from Sarojini Nagar to INA and two more TBM launches from Bhikaji Cama Place to Sarojini Nagar.
This is the second TBM to be lowered on the 58.467 km long Mukundpur-Shiv Vihar corridor. The first TBM on this section is currently operational between Netaji Subhash Place and Shalimar Bagh.
DMRC is slated to construct 53 km of underground Metro lines as part of its Phase III construction work for which about 34 TBMs are expected to be used.
A total of 74 tunnels will be constructed in this phase. The tunneling work between Central Secretariat and ITO on the 9.37 km long Central Secretariat - Kashmere Gate corridor has been already completed.
In Phase II, 14 TBMs were pressed into service for the construction of 34.89 km of Metro lines across the national capital.
*Subscribe to Business Standard digital and get complimentary access to The New York Times

Smart Quarterly

₹900

3 Months

₹300/Month

SAVE 25%

Smart Essential

₹2,700

1 Year

₹225/Month

SAVE 46%
*Complimentary New York Times access for the 2nd year will be given after 12 months

Super Saver

₹3,900

2 Years

₹162/Month

Subscribe

Renews automatically, cancel anytime

Here’s what’s included in our digital subscription plans

Exclusive premium stories online

  • Over 30 premium stories daily, handpicked by our editors

Complimentary Access to The New York Times

  • News, Games, Cooking, Audio, Wirecutter & The Athletic

Business Standard Epaper

  • Digital replica of our daily newspaper — with options to read, save, and share

Curated Newsletters

  • Insights on markets, finance, politics, tech, and more delivered to your inbox

Market Analysis & Investment Insights

  • In-depth market analysis & insights with access to The Smart Investor

Archives

  • Repository of articles and publications dating back to 1997

Ad-free Reading

  • Uninterrupted reading experience with no advertisements

Seamless Access Across All Devices

  • Access Business Standard across devices — mobile, tablet, or PC, via web or app

More From This Section

First Published: Oct 17 2013 | 6:41 PM IST

Next Story