ECoR gears up safety precautions for monsoon, flood situations

Image
Press Trust of India Bhubaneswar
Last Updated : Jun 30 2017 | 3:22 PM IST
The East Coast Railway (ECoR) has taken precautionary steps to protect the tracks during the monsoon to minimise the impact of heavy rains and ensure safe and smooth running of trains.
ECoR General Manager Umesh Singh has directed the officials concerned to be on alert toward any incident caused by monsoon rain and flood situation near railway track for the safety of passengers and smooth train operations, an ECoR official said.
Accordingly, the catch water drains and side drains have been cleared of silt, vegetation and other obstructions to ensure free flow of rain water. The waterways of bridges have also been cleared of vegetation and other obstructions.
Full Supply Level (FSL) in case of canals and Danger Level (DL) for bridges have been drawn with bright red band across each pier adjacent to the abutment so as to be clearly visible to the patrolmen, stationery watchmen and drivers.
Arrangements have been made to prevent stagnation of water on the track. In station yards, cross drains and longitudinal drains have been cleared to proper grades, said ECoR chief public relations officer J P Mishra.
ECoR is in constant touch with the Meteorological Department for weather alerts and proper mobilisation is being done to meet any situation, while officers and staff are kept on alert for attending to monsoon emergencies, he said.
ECoR Control Office, which works round the clock, is keeping close liaison with MeT Department and Disaster Management Cell and employees have been deputed at flood prone areas for continuous monitoring and constant updates.
Patrolling of Railway tracks has been arranged in the monsoon. They would protect the trains and passengers from any unusual occurrence. Stationary patrolmen and watchmen have been deployed at vulnerable locations. Mobile patrolmen have been deployed in vulnerable sections.
Instructions have been issued that whenever there is heavy rain, the sectional gang men will organise patrolling of track to make sure that the track is safe for passage of trains and ensure protection at all locations where washouts or slips are likely to occur.
Steps have been taken to stock sufficient quantities of monsoon reserve materials like boulders, sand, cinder, quarry dust, ballast at identified locations.

Disclaimer: No Business Standard Journalist was involved in creation of this content

*Subscribe to Business Standard digital and get complimentary access to The New York Times

Smart Quarterly

₹900

3 Months

₹300/Month

SAVE 25%

Smart Essential

₹2,700

1 Year

₹225/Month

SAVE 46%
*Complimentary New York Times access for the 2nd year will be given after 12 months

Super Saver

₹3,900

2 Years

₹162/Month

Subscribe

Renews automatically, cancel anytime

Here’s what’s included in our digital subscription plans

Exclusive premium stories online

  • Over 30 premium stories daily, handpicked by our editors

Complimentary Access to The New York Times

  • News, Games, Cooking, Audio, Wirecutter & The Athletic

Business Standard Epaper

  • Digital replica of our daily newspaper — with options to read, save, and share

Curated Newsletters

  • Insights on markets, finance, politics, tech, and more delivered to your inbox

Market Analysis & Investment Insights

  • In-depth market analysis & insights with access to The Smart Investor

Archives

  • Repository of articles and publications dating back to 1997

Ad-free Reading

  • Uninterrupted reading experience with no advertisements

Seamless Access Across All Devices

  • Access Business Standard across devices — mobile, tablet, or PC, via web or app

More From This Section

First Published: Jun 30 2017 | 3:22 PM IST

Next Story