The electrification of the 118 kilometre long Masagram-Bankura route, the only stretch waiting to get electrified in the whole Adra division of South Eastern Railway (SER), would also ensure a single traction for trains.
"This means that we will be able to use electric engines for the entire route from the North East to the south instead of having to change to diesel engines for the non-electrified section," SER spokesman Sanjoy Ghosh told PTI.
Though the stretch between Kharagpur to Bankura via Masagram would be lengthier by 44 kilometre, avoiding these congested suburban sections, where EMU locals ply, would lead to lesser travel time for the express trains, Ghosh said.
Using a single traction would entail a lesser detention en route, he noted.
"A large number of patients and students travel between the North East and southern destinations of Bengaluru, Hyderabad and Chennai every day," he said.
Howrah station is choc a bloc with trains throughout the day and finds it hard to allot platforms for trains, leading to long waiting time outside the station, Ghosh added.
The SER spokesman said that the completion of 24-km rail link between Bowachandi and Khana Junction stations would also help reduce travel time for trains between the north-east and various destinations in the south and the west.
The route, which was sanctioned in the Railway Budget of 2005-06, had faced land acquisition hurdles leading to delay in completion.
"The Railways has deposited Rs 14.34 crore with the West Bengal government for land acquisition for the rail link. Around 90 per cent of the land required for the project has been handed over to SER," Ghosh said.
This Bowachandi-Khana route will serve as an important link between SER's Adra division and Eastern Railway's Howrah division, reducing distance between Kharagpur and Khana by 19 kilometre, Ghosh said.
Disclaimer: No Business Standard Journalist was involved in creation of this content
You’ve reached your limit of {{free_limit}} free articles this month.
Subscribe now for unlimited access.
Already subscribed? Log in
Subscribe to read the full story →
Smart Quarterly
₹900
3 Months
₹300/Month
Smart Essential
₹2,700
1 Year
₹225/Month
Super Saver
₹3,900
2 Years
₹162/Month
Renews automatically, cancel anytime
Here’s what’s included in our digital subscription plans
Exclusive premium stories online
Over 30 premium stories daily, handpicked by our editors


Complimentary Access to The New York Times
News, Games, Cooking, Audio, Wirecutter & The Athletic
Business Standard Epaper
Digital replica of our daily newspaper — with options to read, save, and share


Curated Newsletters
Insights on markets, finance, politics, tech, and more delivered to your inbox
Market Analysis & Investment Insights
In-depth market analysis & insights with access to The Smart Investor


Archives
Repository of articles and publications dating back to 1997
Ad-free Reading
Uninterrupted reading experience with no advertisements


Seamless Access Across All Devices
Access Business Standard across devices — mobile, tablet, or PC, via web or app
